Thorne North
TNNYorkshire and The HumberManaged by Northern Trains
How this station is performing
Thorne North had 13,360 scheduled stops to Period 7 of 2026-27, about 37 a day. 79.8% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Thorne North opened on 2 August 1869, 157 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Rawcliffe is the oldest (1848) and Kirk Sandall the newest (1991), with Thorne North in between.
The nearest stations to Thorne North are Thorne South (1.8 km south-east), Hatfield and Stainforth (4.6 km south-west), Rawcliffe (8.1 km north), Kirk Sandall (9.0 km south-west) and Snaith (9.3 km north-west). 5 stations lie within 10 km in all. At 79.8%, Thorne North is less punctual than all of them; the best of the five, Snaith, manages 87.0%.
Thorne North is named after Thorne, a town, home to about 18,096 people, but the station stands 1.3 km from its centre.
For Thorne North, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 60.7% of stops arrived within three minutes of the timetable. The strongest was Period 3 of 2023-24, at 91.0%, which is 30.3 percentage points higher. Cancellations peaked at 9.8% of scheduled stops in Period 7 of 2023-24, against 3.4% over the latest 13 periods.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Thorne North on 79.8%. The comparison group includes Woodhouse (81.8%), South Elmsall (72.0%) and Darnall (83.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 13,360 | 79.8% | 3.4% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 975 | 88.1% | 3.3% |
| Period 6 of 2026-27 | 1,012 | 85.8% | 2.9% |
| Period 5 of 2026-27 | 1,016 | 84.7% | 2.7% |
| Period 4 of 2026-27 | 1,013 | 78.0% | 8.3% |
| Period 3 of 2026-27 | 1,016 | 81.7% | 3.3% |
| Period 2 of 2026-27 | 1,014 | 81.3% | 2.7% |
| Period 1 of 2026-27 | 1,164 | 87.0% | 1.9% |
| Period 13 of 2025-26 | 1,122 | 84.3% | 2.0% |
| Period 12 of 2025-26 | 1,016 | 84.1% | 1.9% |
| Period 11 of 2025-26 | 1,016 | 79.4% | 5.1% |
| Period 10 of 2025-26 | 934 | 76.1% | 3.5% |
| Period 9 of 2025-26 | 1,031 | 60.7% | 4.8% |
| Period 8 of 2025-26 | 1,031 | 64.7% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Woodhouse | 13,384 | 81.8% | 2.0% |
| South Elmsall | 13,211 | 72.0% | 2.1% |
| Darnall | 13,203 | 83.2% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out