Wivelsfield
WVFSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Wivelsfield had 50,198 scheduled stops to Period 7 of 2026-27, about 138 a day. 69.8% of recorded arrivals were within three minutes of the timetable and 4.2% of scheduled stops were cancelled.
Wivelsfield opened on 1 August 1886, 140 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Wivelsfield is the newest; the oldest, Burgess Hill, opened in 1841.
The nearest stations to Wivelsfield are Burgess Hill (1.3 km south), Haywards Heath (4.6 km north), Hassocks (4.7 km south), Plumpton (5.8 km south-east) and Balcombe (10.2 km north). 4 stations lie within 10 km in all. Of the five, Balcombe is the most punctual at 76.6% and Plumpton the least at 67.8%, with Wivelsfield on 69.8%.
Wivelsfield takes its name from a Village called Wivelsfield, home to about 2,960 people, and the station stands 2.2 km from its centre.
For Wivelsfield, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 44.4% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 82.6%, which is 38.2 percentage points higher. Cancellations peaked at 8.9% of scheduled stops in Period 9 of 2024-25, against 4.2% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Wivelsfield is the least punctual, at 69.8%. All of them are ahead, including Bognor Regis (89.2%), Merstham (80.8%) and Langley (Berks) (84.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 50,198 | 69.8% | 4.2% |
Operators with their own page for this station are linked to it.
Late train at Wivelsfield? Delay Repay
These operators call at Wivelsfield and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,506 | 61.9% | 4.3% |
| Period 6 of 2026-27 | 3,411 | 44.4% | 4.1% |
| Period 5 of 2026-27 | 3,411 | 62.8% | 7.5% |
| Period 4 of 2026-27 | 4,012 | 68.8% | 4.1% |
| Period 3 of 2026-27 | 3,644 | 68.3% | 4.6% |
| Period 2 of 2026-27 | 3,914 | 76.0% | 4.3% |
| Period 1 of 2026-27 | 4,635 | 80.1% | 3.0% |
| Period 13 of 2025-26 | 4,179 | 81.4% | 2.8% |
| Period 12 of 2025-26 | 3,920 | 73.4% | 1.9% |
| Period 11 of 2025-26 | 3,969 | 74.9% | 2.3% |
| Period 10 of 2025-26 | 3,658 | 74.0% | 4.6% |
| Period 9 of 2025-26 | 3,912 | 62.4% | 6.0% |
| Period 8 of 2025-26 | 4,027 | 70.4% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bognor Regis | 50,301 | 89.2% | 3.9% |
| Merstham | 50,442 | 80.8% | 5.1% |
| Langley (Berks) | 50,800 | 84.5% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out