Bognor Regis
BOGSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Bognor Regis had 50,301 scheduled stops to Period 7 of 2026-27, about 138 a day. 89.2% of recorded arrivals were within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Bognor Regis opened on 1 June 1864, 162 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bognor Regis is the newest; the oldest, Ford, opened in 1846.
The nearest stations to Bognor Regis are Barnham (5.4 km north-east), Ford (8.3 km north-east), Chichester (8.9 km north-west), Littlehampton (9.4 km east) and Arundel (11.3 km north-east). 4 stations lie within 10 km in all. At 89.2%, Bognor Regis is more punctual than every one of them; the best of the five, Littlehampton, manages 83.3%.
Bognor Regis takes its name from a seaside resort called Bognor Regis, home to about 63,885 people, and the station stands 0.6 km from its centre.
For Bognor Regis, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 80.9% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 94.9%, which is 14.0 percentage points higher. Cancellations peaked at 11.9% of scheduled stops in Period 4 of 2023-24, against 3.9% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Bognor Regis is the most punctual, at 89.2%. The comparison group includes Wivelsfield (69.8%), Merstham (80.8%) and Langley (Berks) (84.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 50,301 | 89.2% | 3.9% |
Operators with their own page for this station are linked to it.
Late train at Bognor Regis? Delay Repay
These operators call at Bognor Regis and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,900 | 86.4% | 4.0% |
| Period 6 of 2026-27 | 3,230 | 80.9% | 3.0% |
| Period 5 of 2026-27 | 3,852 | 84.8% | 5.0% |
| Period 4 of 2026-27 | 3,868 | 88.5% | 5.7% |
| Period 3 of 2026-27 | 3,778 | 88.7% | 3.6% |
| Period 2 of 2026-27 | 4,010 | 89.6% | 6.6% |
| Period 1 of 2026-27 | 4,495 | 92.0% | 3.0% |
| Period 13 of 2025-26 | 4,354 | 92.6% | 3.7% |
| Period 12 of 2025-26 | 4,021 | 91.9% | 3.1% |
| Period 11 of 2025-26 | 3,891 | 91.7% | 4.2% |
| Period 10 of 2025-26 | 3,204 | 90.8% | 2.8% |
| Period 9 of 2025-26 | 3,887 | 88.5% | 2.5% |
| Period 8 of 2025-26 | 3,811 | 91.2% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Wivelsfield | 50,198 | 69.8% | 4.2% |
| Merstham | 50,442 | 80.8% | 5.1% |
| Langley (Berks) | 50,800 | 84.5% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out