South Western Railway at Winnersh
All trains at WinnershSouth Western Railway across BritainSouth East
How this operator is doing here
South Western Railway had 25,326 scheduled stops at Winnersh in the 13 periods to Period 7 of 2026-27, 98% of the station's total. 87.1% of recorded arrivals came within three minutes and 2.7% of stops were cancelled.
South Western Railway trains at Winnersh also serve Winnersh Triangle (1.2 km north-west, 85.8% on time, 2.7% cancelled), Earley (3.0 km west, 85.3% on time, 2.7% cancelled), Wokingham (3.2 km south-east, 87.7% on time, 2.2% cancelled), Reading (7.3 km north-west, 87.9% on time, 2.1% cancelled), Bracknell (9.0 km east, 88.6% on time, 2.1% cancelled) and Martins Heron (10.9 km east, 89.7% on time, 2.4% cancelled), which are the stations on its network closest to Winnersh.
Within 30 km of here, South Western Railway runs best at Bagshot, 15.1 km south-east (97.0%), and worst at Basingstoke, 23.2 km south-west (72.6%).
The busiest South Western Railway station within 30 km of Winnersh is Woking, 25.5 km south-east, with about 435 scheduled stops a day.
South Western Railway at Winnersh improved sharply over the past year. In the latest 13 periods 87.1% of stops came within three minutes of the timetable, up 5.6 percentage points from 81.5% in the 13 before. Cancellations held steady at 2.7% of scheduled stops, against 2.8% before.
Period by period
See how South Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,039 | 91.3% | 1.7% |
| Period 6 of 2026-27 | 1,892 | 86.9% | 2.2% |
| Period 5 of 2026-27 | 2,026 | 85.4% | 1.7% |
| Period 4 of 2026-27 | 1,896 | 84.6% | 3.9% |
| Period 3 of 2026-27 | 1,927 | 85.4% | 2.5% |
| Period 2 of 2026-27 | 1,933 | 88.9% | 5.5% |
| Period 1 of 2026-27 | 2,254 | 91.1% | 2.8% |
| Period 13 of 2025-26 | 2,176 | 89.4% | 2.0% |
| Period 12 of 2025-26 | 1,908 | 87.6% | 2.0% |
| Period 11 of 2025-26 | 1,900 | 86.4% | 2.0% |
| Period 10 of 2025-26 | 1,843 | 86.1% | 2.1% |
| Period 9 of 2025-26 | 1,838 | 83.9% | 3.4% |
| Period 8 of 2025-26 | 1,694 | 83.0% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Winnersh
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 508 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out