Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Winnersh

WNSSouth EastManaged by South Western Railway

On time, last 13 periods87.0%Great Britain: 83.6%
Cancelled2.8%Great Britain: 3.2%
Stops a day71Scheduled, on average
Punctuality rank875th of 2,374Among ranked stations

How this station is performing

Winnersh had 25,834 scheduled stops to Period 7 of 2026-27, about 71 a day. 87.0% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.

Winnersh opened on 1 January 1910, 116 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Twyford is the oldest (1839) and Winnersh Triangle the newest (1986), with Winnersh in between.

The nearest stations to Winnersh are Winnersh Triangle (1.2 km north-west), Earley (3.0 km west), Wokingham (3.2 km south-east), Twyford (5.1 km north) and Reading (7.3 km north-west). 11 stations lie within 10 km in all. At 87.0%, Winnersh is more punctual than every one of them; the best of the five, Wokingham, manages 86.6%.

Winnersh takes its name from a Village called Winnersh, home to about 10,872 people, and the station stands 0.3 km from its centre.

Winnersh improved sharply over the past year. In the latest 13 periods 87.0% of stops came within three minutes of the timetable, up 5.4 percentage points from 81.6% in the 13 before. Cancellations held steady at 2.8% of scheduled stops, against 2.8% before.

Compared with 3 stations of a similar size in South East, Winnersh is the most punctual, at 87.0%. The comparison group includes Upper Warlingham (84.2%), Woldingham (85.6%) and Caterham (85.9%).

Period by period

70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 89.4%Period 2 of 2023-24: 90.4%Period 3 of 2023-24: 85.5%Period 4 of 2023-24: 83.6%Period 5 of 2023-24: 87.8%Period 6 of 2023-24: 85.8%Period 7 of 2023-24: 82.8%Period 8 of 2023-24: 76.9%Period 9 of 2023-24: 67.7%Period 10 of 2023-24: 79.6%Period 11 of 2023-24: 80.5%Period 12 of 2023-24: 84.1%Period 13 of 2023-24: 88.3%Period 1 of 2024-25: 88.0%Period 2 of 2024-25: 86.1%Period 3 of 2024-25: 86.5%Period 4 of 2024-25: 82.3%Period 5 of 2024-25: 82.0%Period 6 of 2024-25: 83.3%Period 7 of 2024-25: 84.9%Period 8 of 2024-25: 82.6%Period 9 of 2024-25: 71.4%Period 10 of 2024-25: 74.1%Period 11 of 2024-25: 82.0%Period 12 of 2024-25: 82.7%Period 13 of 2024-25: 83.3%Period 1 of 2025-26: 82.9%Period 2 of 2025-26: 83.9%Period 3 of 2025-26: 79.9%Period 4 of 2025-26: 81.6%Period 5 of 2025-26: 84.9%Period 6 of 2025-26: 84.1%Period 7 of 2025-26: 87.3%Period 8 of 2025-26: 83.2%Period 9 of 2025-26: 83.6%Period 10 of 2025-26: 85.9%Period 11 of 2025-26: 86.3%Period 12 of 2025-26: 87.4%Period 13 of 2025-26: 89.3%Period 1 of 2026-27: 91.0%Period 2 of 2026-27: 88.8%Period 3 of 2026-27: 85.3%Period 4 of 2026-27: 84.7%Period 5 of 2026-27: 85.4%Period 6 of 2026-27: 87.1%Period 7 of 2026-27: 91.1%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.8%Period 2 of 2023-24: 0.3%Period 3 of 2023-24: 3.5%Period 4 of 2023-24: 5.8%Period 5 of 2023-24: 1.7%Period 6 of 2023-24: 1.8%Period 7 of 2023-24: 2.9%Period 8 of 2023-24: 3.6%Period 9 of 2023-24: 2.8%Period 10 of 2023-24: 4.4%Period 11 of 2023-24: 2.2%Period 12 of 2023-24: 1.6%Period 13 of 2023-24: 1.8%Period 1 of 2024-25: 3.3%Period 2 of 2024-25: 2.2%Period 3 of 2024-25: 1.3%Period 4 of 2024-25: 0.8%Period 5 of 2024-25: 2.8%Period 6 of 2024-25: 3.4%Period 7 of 2024-25: 4.1%Period 8 of 2024-25: 4.3%Period 9 of 2024-25: 5.1%Period 10 of 2024-25: 3.2%Period 11 of 2024-25: 2.9%Period 12 of 2024-25: 2.7%Period 13 of 2024-25: 1.4%Period 1 of 2025-26: 1.8%Period 2 of 2025-26: 1.8%Period 3 of 2025-26: 2.2%Period 4 of 2025-26: 2.9%Period 5 of 2025-26: 3.8%Period 6 of 2025-26: 2.6%Period 7 of 2025-26: 2.0%Period 8 of 2025-26: 4.1%Period 9 of 2025-26: 3.3%Period 10 of 2025-26: 2.2%Period 11 of 2025-26: 2.0%Period 12 of 2025-26: 2.2%Period 13 of 2025-26: 1.9%Period 1 of 2026-27: 2.9%Period 2 of 2026-27: 5.5%Period 3 of 2026-27: 2.7%Period 4 of 2026-27: 3.9%Period 5 of 2026-27: 1.8%Period 6 of 2026-27: 2.2%Period 7 of 2026-27: 1.7%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
South Western Railway25,32687.1%2.7%
Great Western Railway508––

Operators with their own page for this station are linked to it.

Late train at Winnersh? Delay Repay

These operators call at Winnersh and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-272,07991.1%1.7%
Period 6 of 2026-271,93287.1%2.2%
Period 5 of 2026-272,06685.4%1.8%
Period 4 of 2026-271,93684.7%3.9%
Period 3 of 2026-271,96785.3%2.7%
Period 2 of 2026-271,97188.8%5.5%
Period 1 of 2026-272,29691.0%2.9%
Period 13 of 2025-262,22089.3%1.9%
Period 12 of 2025-261,94887.4%2.2%
Period 11 of 2025-261,94086.3%2.0%
Period 10 of 2025-261,86985.9%2.2%
Period 9 of 2025-261,87883.6%3.3%
Period 8 of 2025-261,73283.2%4.1%

Time of year

70%75%80%85%90%P1: 88.1%1P2: 87.3%2P3: 84.4%3P4: 83.0%4P5: 84.9%5P6: 85.0%6P7: 86.8%7P8: 80.8%8P9: 74.4%9P10: 79.9%10P11: 83.1%11P12: 84.9%12P13: 86.9%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in South East

StationScheduled stopsWithin 3 minCancelled
Upper Warlingham25,87584.2%2.3%
Woldingham25,87585.6%2.3%
Caterham25,90285.9%1.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out