Widdrington
WDDNorth EastManaged by Northern Trains
How this station is performing
Widdrington had 933 scheduled stops to Period 7 of 2026-27, about 3 a day. 66.5% of recorded arrivals were within three minutes of the timetable and 0.2% of scheduled stops were cancelled.
Widdrington opened on 1 July 1847, 179 years before the latest figures here, and has not been moved since. Of the 4 stations nearest to it with a known opening date, Widdrington is the oldest; the next oldest, Acklington, dates from 1847.
The nearest stations to Widdrington are Ashington (7.2 km south-east), Pegswood (7.2 km south), Acklington (7.6 km north), Morpeth (9.7 km south-west) and Bedlington (11.6 km south). 4 stations lie within 10 km in all. Of the five, Ashington is the most punctual at 82.1% and Pegswood the least at 66.4%, with Widdrington on 66.5%.
Widdrington is named after Widdrington Village, a Village, home to about 177 people, but the station stands 2.0 km from its centre.
Widdrington has slipped sharply. 66.5% of stops came within three minutes of the timetable in the latest 13 periods, 11.2 percentage points worse than the 77.7% recorded in the 13 before. Cancellations fell to 0.2% of scheduled stops from 1.2%, which is 1.0 percentage points fewer.
2 of 3 stations of a similar size in North East are more punctual than Widdrington on 66.5%. The comparison group includes Acklington (77.0%), Pegswood (66.4%) and Chathill (76.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 933 | 66.5% | 0.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 66 | 60.6% | 0.0% |
| Period 6 of 2026-27 | 69 | 71.6% | 1.4% |
| Period 5 of 2026-27 | 72 | 58.3% | 0.0% |
| Period 4 of 2026-27 | 72 | 69.4% | 0.0% |
| Period 3 of 2026-27 | 72 | 70.4% | 0.0% |
| Period 2 of 2026-27 | 72 | 66.7% | 0.0% |
| Period 1 of 2026-27 | 84 | 70.2% | 0.0% |
| Period 13 of 2025-26 | 78 | 69.2% | 0.0% |
| Period 12 of 2025-26 | 72 | 75.0% | 0.0% |
| Period 11 of 2025-26 | 69 | 64.7% | 1.4% |
| Period 10 of 2025-26 | 63 | 60.3% | 0.0% |
| Period 9 of 2025-26 | 72 | 61.1% | 0.0% |
| Period 8 of 2025-26 | 72 | 65.3% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Acklington | 933 | 77.0% | 0.2% |
| Pegswood | 933 | 66.4% | 0.2% |
| Chathill | 1,244 | 76.5% | 0.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out