Chathill
CHTNorth EastManaged by Northern Trains
How this station is performing
Chathill had 1,244 scheduled stops to Period 7 of 2026-27, about 3 a day. 76.5% of recorded arrivals were within three minutes of the timetable and 0.2% of scheduled stops were cancelled.
Chathill opened on 29 March 1847, 179 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Berwick-upon-Tweed is the oldest (1846) and Pegswood the newest (1903), with Chathill in between.
Chathill is remote: its nearest neighbours are Alnmouth (16.6 km south), Acklington (25.7 km south), Berwick-upon-Tweed (32.6 km north-west), Widdrington (33.3 km south) and Pegswood (40.0 km south). Of the five, Acklington is the most punctual at 77.0% and Alnmouth the least at 65.8%, with Chathill on 76.5%.
Chathill takes its name from a Village called Chathill, and the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Chathill was Period 8 of 2023-24, at 48.9%, some time before the latest year. The strongest was Period 13 of 2024-25, at 88.8%, and the two are 39.9 percentage points apart. Cancellations peaked at 5.4% of scheduled stops in Period 1 of 2024-25, against 0.2% over the latest 13 periods.
1 of 3 stations of a similar size in North East are more punctual than Chathill on 76.5%. The comparison group includes Acklington (77.0%), Pegswood (66.4%) and Widdrington (66.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 1,244 | 76.5% | 0.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 88 | 73.9% | 0.0% |
| Period 6 of 2026-27 | 92 | 76.7% | 2.2% |
| Period 5 of 2026-27 | 96 | 74.0% | 0.0% |
| Period 4 of 2026-27 | 96 | 80.2% | 0.0% |
| Period 3 of 2026-27 | 96 | 74.0% | 0.0% |
| Period 2 of 2026-27 | 96 | 81.3% | 0.0% |
| Period 1 of 2026-27 | 112 | 79.5% | 0.0% |
| Period 13 of 2025-26 | 104 | 82.7% | 0.0% |
| Period 12 of 2025-26 | 96 | 83.3% | 0.0% |
| Period 11 of 2025-26 | 92 | 80.2% | 1.1% |
| Period 10 of 2025-26 | 84 | 76.2% | 0.0% |
| Period 9 of 2025-26 | 96 | 63.5% | 0.0% |
| Period 8 of 2025-26 | 96 | 67.7% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Acklington | 933 | 77.0% | 0.2% |
| Pegswood | 933 | 66.4% | 0.2% |
| Widdrington | 933 | 66.5% | 0.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out