Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Whitton (London)

WTNLondonManaged by South Western Railway

On time, last 13 periods91.1%Great Britain: 83.6%
Cancelled3.0%Great Britain: 3.2%
Stops a day97Scheduled, on average
Punctuality rank440th of 2,374Among ranked stations

How this station is performing

Whitton (London) had 35,355 scheduled stops to Period 7 of 2026-27, about 97 a day. 91.1% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.

Whitton (London) opened on 6 July 1930, 96 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Whitton (London) is the newest; the oldest, Twickenham, opened in 1848.

The nearest stations to Whitton (London) are Hounslow (1.5 km north), Strawberry Hill (1.7 km south-east), Fulwell (1.8 km south), Twickenham (2.0 km east) and St Margarets (London) (2.7 km east). 56 stations lie within 10 km in all. At 91.1%, Whitton (London) is more punctual than every one of them; the best of the five, St Margarets (London), manages 88.8%.

Whitton (London) is named after Whitton, an area of London, but the station stands 0.5 km from its centre.

Across the whole run of data, the weakest four-week period for Whitton (London) was Period 9 of 2024-25, at 76.3%, some time before the latest year. The strongest was Period 7 of 2026-27, at 93.9%, and the two are 17.6 percentage points apart. Cancellations peaked at 7.6% of scheduled stops in Period 10 of 2024-25, against 3.0% over the latest 13 periods.

2 of 3 stations of a similar size in London are more punctual than Whitton (London) on 91.1%. The comparison group includes St Margarets (London) (88.8%), Bowes Park (91.9%) and Grange Park (91.7%).

Period by period

70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 91.9%Period 2 of 2023-24: 92.8%Period 3 of 2023-24: 89.6%Period 4 of 2023-24: 91.5%Period 5 of 2023-24: 92.3%Period 6 of 2023-24: 88.7%Period 7 of 2023-24: 89.0%Period 8 of 2023-24: 85.8%Period 9 of 2023-24: 84.0%Period 10 of 2023-24: 87.1%Period 11 of 2023-24: 89.1%Period 12 of 2023-24: 87.8%Period 13 of 2023-24: 88.7%Period 1 of 2024-25: 92.9%Period 2 of 2024-25: 91.6%Period 3 of 2024-25: 91.1%Period 4 of 2024-25: 92.5%Period 5 of 2024-25: 89.7%Period 6 of 2024-25: 90.0%Period 7 of 2024-25: 87.7%Period 8 of 2024-25: 85.3%Period 9 of 2024-25: 76.3%Period 10 of 2024-25: 84.9%Period 11 of 2024-25: 90.4%Period 12 of 2024-25: 92.0%Period 13 of 2024-25: 92.3%Period 1 of 2025-26: 90.1%Period 2 of 2025-26: 92.3%Period 3 of 2025-26: 90.2%Period 4 of 2025-26: 89.3%Period 5 of 2025-26: 89.1%Period 6 of 2025-26: 88.0%Period 7 of 2025-26: 88.7%Period 8 of 2025-26: 86.0%Period 9 of 2025-26: 87.1%Period 10 of 2025-26: 92.1%Period 11 of 2025-26: 93.1%Period 12 of 2025-26: 91.8%Period 13 of 2025-26: 92.8%Period 1 of 2026-27: 93.5%Period 2 of 2026-27: 90.9%Period 3 of 2026-27: 89.5%Period 4 of 2026-27: 90.9%Period 5 of 2026-27: 91.2%Period 6 of 2026-27: 91.3%Period 7 of 2026-27: 93.9%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 1.4%Period 2 of 2023-24: 1.3%Period 3 of 2023-24: 3.2%Period 4 of 2023-24: 1.7%Period 5 of 2023-24: 1.5%Period 6 of 2023-24: 3.8%Period 7 of 2023-24: 3.1%Period 8 of 2023-24: 3.4%Period 9 of 2023-24: 3.4%Period 10 of 2023-24: 2.0%Period 11 of 2023-24: 1.8%Period 12 of 2023-24: 1.2%Period 13 of 2023-24: 2.5%Period 1 of 2024-25: 2.1%Period 2 of 2024-25: 2.5%Period 3 of 2024-25: 1.7%Period 4 of 2024-25: 1.7%Period 5 of 2024-25: 2.6%Period 6 of 2024-25: 3.9%Period 7 of 2024-25: 3.4%Period 8 of 2024-25: 2.9%Period 9 of 2024-25: 4.9%Period 10 of 2024-25: 7.6%Period 11 of 2024-25: 4.8%Period 12 of 2024-25: 4.5%Period 13 of 2024-25: 2.9%Period 1 of 2025-26: 3.9%Period 2 of 2025-26: 2.4%Period 3 of 2025-26: 3.6%Period 4 of 2025-26: 4.3%Period 5 of 2025-26: 3.6%Period 6 of 2025-26: 2.8%Period 7 of 2025-26: 3.6%Period 8 of 2025-26: 4.7%Period 9 of 2025-26: 2.4%Period 10 of 2025-26: 3.1%Period 11 of 2025-26: 1.5%Period 12 of 2025-26: 3.7%Period 13 of 2025-26: 0.8%Period 1 of 2026-27: 2.7%Period 2 of 2026-27: 6.7%Period 3 of 2026-27: 3.3%Period 4 of 2026-27: 2.3%Period 5 of 2026-27: 3.1%Period 6 of 2026-27: 2.9%Period 7 of 2026-27: 2.1%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
South Western Railway35,35591.1%3.0%

Operators with their own page for this station are linked to it.

Late train at Whitton (London)? Delay Repay

These operators call at Whitton (London) and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-272,70793.9%2.1%
Period 6 of 2026-272,75691.3%2.9%
Period 5 of 2026-272,74191.2%3.1%
Period 4 of 2026-272,74190.9%2.3%
Period 3 of 2026-272,56289.5%3.3%
Period 2 of 2026-272,70290.9%6.7%
Period 1 of 2026-272,93793.5%2.7%
Period 13 of 2025-262,94092.8%0.8%
Period 12 of 2025-262,73491.8%3.7%
Period 11 of 2025-262,76493.1%1.5%
Period 10 of 2025-262,32792.1%3.1%
Period 9 of 2025-262,72487.1%2.4%
Period 8 of 2025-262,72086.0%4.7%

Time of year

75%80%85%90%95%P1: 92.2%1P2: 91.9%2P3: 90.1%3P4: 91.0%4P5: 90.5%5P6: 89.6%6P7: 89.8%7P8: 85.7%8P9: 82.5%9P10: 88.0%10P11: 90.9%11P12: 90.5%12P13: 91.3%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in London

StationScheduled stopsWithin 3 minCancelled
St Margarets (London)35,39288.8%3.9%
Bowes Park35,41291.9%4.4%
Grange Park35,41691.7%4.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out