Grange Park
GPKLondonManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Grange Park had 35,416 scheduled stops to Period 7 of 2026-27, about 97 a day. 91.7% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Grange Park opened on 4 April 1910, 116 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Grange Park is the newest; the oldest, Enfield Town, opened in 1849.
The nearest stations to Grange Park are Winchmore Hill (1.1 km south), Enfield Chase (1.1 km north-east), Enfield Town (1.5 km north-east), Bush Hill Park (1.9 km east) and Gordon Hill (2.2 km north). 50 stations lie within 10 km in all. Of the five, Enfield Town is the most punctual at 95.7% and Gordon Hill the least at 90.3%, with Grange Park on 91.7%.
Grange Park is one of 2 stations named after an area of London called Grange Park; this one stands 0.8 km from its centre.
For Grange Park, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 71.4% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 97.6%, which is 26.2 percentage points higher. Cancellations peaked at 9.2% of scheduled stops in Period 6 of 2026-27, against 4.5% over the latest 13 periods.
1 of 3 stations of a similar size in London are more punctual than Grange Park on 91.7%. The comparison group includes Bowes Park (91.9%), St Margarets (London) (88.8%) and Hadley Wood (89.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 35,416 | 91.7% | 4.5% |
Operators with their own page for this station are linked to it.
Late train at Grange Park? Delay Repay
These operators call at Grange Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,715 | 90.0% | 5.5% |
| Period 6 of 2026-27 | 2,685 | 71.4% | 9.2% |
| Period 5 of 2026-27 | 2,750 | 88.2% | 7.7% |
| Period 4 of 2026-27 | 2,765 | 94.0% | 6.3% |
| Period 3 of 2026-27 | 2,742 | 93.3% | 6.5% |
| Period 2 of 2026-27 | 2,708 | 92.8% | 4.3% |
| Period 1 of 2026-27 | 3,116 | 94.5% | 3.8% |
| Period 13 of 2025-26 | 3,078 | 94.8% | 2.7% |
| Period 12 of 2025-26 | 2,563 | 94.6% | 2.0% |
| Period 11 of 2025-26 | 2,591 | 94.4% | 1.3% |
| Period 10 of 2025-26 | 2,297 | 94.5% | 2.2% |
| Period 9 of 2025-26 | 2,750 | 93.1% | 4.2% |
| Period 8 of 2025-26 | 2,656 | 95.1% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bowes Park | 35,412 | 91.9% | 4.4% |
| St Margarets (London) | 35,392 | 88.8% | 3.9% |
| Hadley Wood | 35,454 | 89.5% | 4.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out