Whittlesford Parkway
WLFEast of EnglandManaged by Greater Anglia
How this station is performing
Whittlesford Parkway had 37,898 scheduled stops to Period 7 of 2026-27, about 104 a day. 86.2% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Whittlesford Parkway opened on 30 July 1845, 181 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Whittlesford Parkway is the oldest; the next oldest, Great Chesterford, dates from 1845.
The nearest stations to Whittlesford Parkway are Great Chesterford (5.2 km south), Shelford (Cambs) (5.4 km north), Foxton (7.7 km west), Shepreth (9.2 km west) and Cambridge (10.3 km north). 4 stations lie within 10 km in all. Of the five, Shelford (Cambs) is the most punctual at 87.7% and Foxton the least at 66.8%, with Whittlesford Parkway on 86.2%.
Whittlesford Parkway is a parkway station, 1.5 km from the centre of Whittlesford, a Village, home to about 1,880 people, which gives it its name.
For Whittlesford Parkway, the weakest four-week period in the data is a recent one: Period 5 of 2026-27, when only 79.8% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2023-24, at 94.8%, which is 15.0 percentage points higher. Cancellations peaked at 5.5% of scheduled stops in Period 12 of 2023-24, against 2.0% over the latest 13 periods.
2 of 3 stations of a similar size in East of England are more punctual than Whittlesford Parkway on 86.2%. The comparison group includes Stowmarket (86.1%), Prittlewell (88.6%) and Southend Airport (87.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 37,898 | 86.2% | 2.0% |
Operators with their own page for this station are linked to it.
Late train at Whittlesford Parkway? Delay Repay
These operators call at Whittlesford Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,096 | 81.2% | 2.8% |
| Period 6 of 2026-27 | 3,099 | 81.4% | 1.9% |
| Period 5 of 2026-27 | 3,098 | 79.8% | 4.0% |
| Period 4 of 2026-27 | 3,009 | 84.0% | 3.0% |
| Period 3 of 2026-27 | 3,017 | 86.1% | 1.7% |
| Period 2 of 2026-27 | 2,452 | 88.5% | 0.7% |
| Period 1 of 2026-27 | 3,422 | 91.1% | 1.6% |
| Period 13 of 2025-26 | 3,292 | 89.3% | 1.9% |
| Period 12 of 2025-26 | 2,959 | 89.0% | 1.9% |
| Period 11 of 2025-26 | 2,822 | 89.2% | 1.1% |
| Period 10 of 2025-26 | 1,892 | 89.7% | 1.3% |
| Period 9 of 2025-26 | 2,909 | 83.6% | 1.4% |
| Period 8 of 2025-26 | 2,831 | 88.5% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stowmarket | 37,982 | 86.1% | 1.0% |
| Prittlewell | 37,787 | 88.6% | 1.3% |
| Southend Airport | 38,275 | 87.9% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out