Southend Airport
SIAEast of EnglandManaged by Stobart Rail
How this station is performing
Southend Airport had 38,275 scheduled stops to Period 7 of 2026-27, about 105 a day. 87.9% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Southend Airport opened on 18 July 2011, 15 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Southend Airport is the newest; the oldest, Southend Central, opened in 1856.
The nearest stations to Southend Airport are Rochford (1.3 km north), Prittlewell (2.2 km south), Southend Victoria (3.0 km south), Southend Central (3.6 km south) and Westcliff (3.7 km south). 14 stations lie within 10 km in all. Of the five, Southend Victoria is the most punctual at 92.1% and Southend Central the least at 87.2%, with Southend Airport on 87.9%.
Southend Airport serves an airport 3.6 km from the centre of Southend-on-Sea, a city, home to about 160,257 people.
For Southend Airport, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 59.4% of stops arrived within three minutes of the timetable. The strongest was Period 6 of 2023-24, at 97.9%, which is 38.5 percentage points higher.
2 of 3 stations of a similar size in East of England are more punctual than Southend Airport on 87.9%. The comparison group includes Rayleigh (88.2%), Waltham Cross (87.8%) and Rochford (88.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 38,275 | 87.9% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Southend Airport? Delay Repay
These operators call at Southend Airport and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,101 | 59.4% | 1.0% |
| Period 6 of 2026-27 | 2,769 | 61.5% | 0.3% |
| Period 5 of 2026-27 | 2,307 | 92.8% | 4.6% |
| Period 4 of 2026-27 | 3,094 | 93.7% | 2.5% |
| Period 3 of 2026-27 | 2,906 | 92.7% | 2.9% |
| Period 2 of 2026-27 | 3,098 | 94.6% | 0.2% |
| Period 1 of 2026-27 | 3,566 | 94.1% | 1.2% |
| Period 13 of 2025-26 | 3,074 | 94.7% | 0.9% |
| Period 12 of 2025-26 | 3,162 | 94.9% | 0.3% |
| Period 11 of 2025-26 | 3,288 | 94.7% | 0.5% |
| Period 10 of 2025-26 | 2,671 | 91.1% | 0.4% |
| Period 9 of 2025-26 | 2,879 | 93.0% | 0.5% |
| Period 8 of 2025-26 | 2,360 | 83.0% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Rayleigh | 38,494 | 88.2% | 1.3% |
| Waltham Cross | 38,503 | 87.8% | 2.8% |
| Rochford | 38,549 | 88.4% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out