Prittlewell
PRLEast of EnglandManaged by Greater Anglia
How this station is performing
Prittlewell had 37,787 scheduled stops to Period 7 of 2026-27, about 104 a day. 88.6% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Prittlewell opened on 1 October 1889, 137 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Southend Central is the oldest (1856) and Southend Airport the newest (2011), with Prittlewell in between.
The nearest stations to Prittlewell are Southend Victoria (0.9 km south), Southend Central (1.5 km south), Southend East (1.9 km south-east), Westcliff (1.9 km south-west) and Southend Airport (2.2 km north). 12 stations lie within 10 km in all. Of the five, Southend Victoria is the most punctual at 92.1% and Southend Central the least at 87.2%, with Prittlewell on 88.6%.
Prittlewell takes its name from a town called Prittlewell, home to about 9,971 people, and the station stands 0.5 km from its centre.
For Prittlewell, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 62.4% of stops arrived within three minutes of the timetable. The strongest was Period 6 of 2023-24, at 98.0%, which is 35.6 percentage points higher.
Compared with 3 stations of a similar size in East of England, Prittlewell is the most punctual, at 88.6%. The comparison group includes Whittlesford Parkway (86.2%), Stowmarket (86.1%) and Southend Airport (87.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 37,787 | 88.6% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Prittlewell? Delay Repay
These operators call at Prittlewell and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,053 | 62.5% | 1.0% |
| Period 6 of 2026-27 | 2,726 | 62.4% | 0.3% |
| Period 5 of 2026-27 | 2,272 | 93.1% | 4.6% |
| Period 4 of 2026-27 | 3,045 | 94.4% | 2.5% |
| Period 3 of 2026-27 | 2,855 | 92.7% | 2.9% |
| Period 2 of 2026-27 | 3,046 | 94.8% | 0.2% |
| Period 1 of 2026-27 | 3,506 | 94.3% | 1.2% |
| Period 13 of 2025-26 | 3,023 | 95.0% | 0.9% |
| Period 12 of 2025-26 | 3,110 | 95.4% | 0.3% |
| Period 11 of 2025-26 | 3,236 | 94.9% | 0.5% |
| Period 10 of 2025-26 | 2,625 | 91.0% | 0.5% |
| Period 9 of 2025-26 | 2,854 | 93.0% | 0.5% |
| Period 8 of 2025-26 | 2,436 | 85.3% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Whittlesford Parkway | 37,898 | 86.2% | 2.0% |
| Stowmarket | 37,982 | 86.1% | 1.0% |
| Southend Airport | 38,275 | 87.9% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out