Whitland
WTLWalesManaged by TfW Rail
How this station is performing
Whitland had 18,791 scheduled stops to Period 7 of 2026-27, about 52 a day. 67.8% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Whitland opened on 2 January 1854, 172 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Whitland is the oldest; the next oldest, Clunderwen, dates from 1854.
The nearest stations to Whitland are Narberth (8.0 km west), Clunderwen (8.4 km west), Kilgetty (11.8 km south-west), Saundersfoot (12.8 km south-west) and Tenby (17.4 km south). 2 stations lie within 10 km in all. Of the five, Tenby is the most punctual at 72.9% and Saundersfoot the least at 57.2%, with Whitland on 67.8%.
Whitland takes its name from a town called Whitland, home to about 1,903 people, and the station stands 0.3 km from its centre.
For Whitland, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 54.7% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2023-24, at 79.4%, which is 24.7 percentage points higher. Cancellations peaked at 7.4% of scheduled stops in Period 10 of 2023-24, against 3.4% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Whitland is the least punctual, at 67.8%. All of them are ahead, including Llanharan (69.3%), Pencoed (70.7%) and Pontyclun (69.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 18,723 | 67.8% | 3.4% |
| Great Western Railway | 68 | – | – |
Operators with their own page for this station are linked to it.
Late train at Whitland? Delay Repay
These operators call at Whitland and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,415 | 70.8% | 2.6% |
| Period 6 of 2026-27 | 1,554 | 67.0% | 1.2% |
| Period 5 of 2026-27 | 1,582 | 64.3% | 4.1% |
| Period 4 of 2026-27 | 1,543 | 62.8% | 4.8% |
| Period 3 of 2026-27 | 1,542 | 65.6% | 3.6% |
| Period 2 of 2026-27 | 1,470 | 68.8% | 6.8% |
| Period 1 of 2026-27 | 1,633 | 66.9% | 2.3% |
| Period 13 of 2025-26 | 1,463 | 71.9% | 1.8% |
| Period 12 of 2025-26 | 1,420 | 77.2% | 1.0% |
| Period 11 of 2025-26 | 1,331 | 77.3% | 3.2% |
| Period 10 of 2025-26 | 1,284 | 69.2% | 4.4% |
| Period 9 of 2025-26 | 1,379 | 54.7% | 3.9% |
| Period 8 of 2025-26 | 1,175 | 65.4% | 4.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out