Llanharan
LLRWalesManaged by TfW Rail
How this station is performing
Llanharan had 19,167 scheduled stops to Period 7 of 2026-27, about 53 a day. 69.3% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Llanharan opened on 1 September 1899 and closed to passengers on 2 November 1964. It reopened on 10 December 2007, 19 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Pencoed is the oldest (1850) and Pontyclun the newest (1992), with Llanharan in between.
The nearest stations to Llanharan are Pontyclun (3.8 km south-east), Pencoed (4.4 km west), Porth (8.6 km north), Dinas (Rhondda) (8.8 km north) and Trehafod (9.1 km north-east). 9 stations lie within 10 km in all. Of the five, Dinas (Rhondda) is the most punctual at 96.2% and Pontyclun the least at 69.0%, with Llanharan on 69.3%.
Llanharan takes its name from a Village called Llanharan, home to about 8,966 people, and the station stands 1.2 km from its centre.
Across the whole run of data, the weakest four-week period for Llanharan was Period 9 of 2023-24, at 43.1%, some time before the latest year. The strongest was Period 11 of 2025-26, at 78.7%, and the two are 35.6 percentage points apart. Cancellations peaked at 6.1% of scheduled stops in Period 9 of 2024-25, against 2.1% over the latest 13 periods.
1 of 3 stations of a similar size in Wales are more punctual than Llanharan on 69.3%. The comparison group includes Pencoed (70.7%), Pontyclun (69.0%) and Cwmbran (68.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 19,167 | 69.3% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Llanharan? Delay Repay
These operators call at Llanharan and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,334 | 66.3% | 2.1% |
| Period 6 of 2026-27 | 1,425 | 69.3% | 1.3% |
| Period 5 of 2026-27 | 1,379 | 62.1% | 4.2% |
| Period 4 of 2026-27 | 1,518 | 67.8% | 2.6% |
| Period 3 of 2026-27 | 1,411 | 69.5% | 1.2% |
| Period 2 of 2026-27 | 1,510 | 70.5% | 2.8% |
| Period 1 of 2026-27 | 1,753 | 75.5% | 2.2% |
| Period 13 of 2025-26 | 1,633 | 76.9% | 0.9% |
| Period 12 of 2025-26 | 1,515 | 78.1% | 2.4% |
| Period 11 of 2025-26 | 1,451 | 78.7% | 1.4% |
| Period 10 of 2025-26 | 1,281 | 64.1% | 2.3% |
| Period 9 of 2025-26 | 1,482 | 55.0% | 2.2% |
| Period 8 of 2025-26 | 1,475 | 63.5% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out