Pontyclun
PYCWalesManaged by TfW Rail
How this station is performing
Pontyclun had 19,168 scheduled stops to Period 7 of 2026-27, about 53 a day. 69.0% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Pontyclun opened on 28 September 1992, 34 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Pontyclun is the newest; the oldest, Taffs Well, opened in 1840.
The nearest stations to Pontyclun are Llanharan (3.8 km north-west), Pencoed (7.6 km west), Trefforest Estate (8.6 km north-east), Trefforest (8.9 km north-east) and Taffs Well (9.1 km east). 9 stations lie within 10 km in all. At 69.0%, Pontyclun is less punctual than all of them; the best of the five, Trefforest, manages 92.5%.
Pontyclun takes its name from a Village called Pontyclun, home to about 8,086 people, and the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Pontyclun was Period 9 of 2023-24, at 45.9%, some time before the latest year. The strongest was Period 11 of 2025-26, at 77.7%, and the two are 31.8 percentage points apart. Cancellations peaked at 5.9% of scheduled stops in Period 9 of 2024-25, against 2.2% over the latest 13 periods.
2 of 3 stations of a similar size in Wales are more punctual than Pontyclun on 69.0%. The comparison group includes Llanharan (69.3%), Pencoed (70.7%) and Cwmbran (68.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 19,168 | 69.0% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at Pontyclun? Delay Repay
These operators call at Pontyclun and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,334 | 65.8% | 2.1% |
| Period 6 of 2026-27 | 1,425 | 69.8% | 1.3% |
| Period 5 of 2026-27 | 1,379 | 61.9% | 4.3% |
| Period 4 of 2026-27 | 1,518 | 67.7% | 2.6% |
| Period 3 of 2026-27 | 1,411 | 69.5% | 1.3% |
| Period 2 of 2026-27 | 1,510 | 70.4% | 2.8% |
| Period 1 of 2026-27 | 1,754 | 74.9% | 2.4% |
| Period 13 of 2025-26 | 1,633 | 76.2% | 0.9% |
| Period 12 of 2025-26 | 1,515 | 77.1% | 2.6% |
| Period 11 of 2025-26 | 1,451 | 77.7% | 1.5% |
| Period 10 of 2025-26 | 1,281 | 64.2% | 2.2% |
| Period 9 of 2025-26 | 1,482 | 54.5% | 2.2% |
| Period 8 of 2025-26 | 1,475 | 63.3% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out