Elizabeth line at Whitechapel
All trains at WhitechapelElizabeth line across BritainLondon
How this operator is doing here
Elizabeth line had 226,864 scheduled stops at Whitechapel in the 13 periods to Period 7 of 2026-27, 52% of the station's total. 92.2% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
Elizabeth line trains at Whitechapel also serve London Liverpool Street (1.5 km west, 92.5% on time, 2.7% cancelled), Farringdon (3.1 km west, 92.4% on time, 2.6% cancelled), Canary Wharf (3.3 km south-east, 93.9% on time, 2.4% cancelled), Stratford (London) (4.6 km north-east, 89.5% on time, 2.3% cancelled), Tottenham Court Road (5.0 km west, 92.1% on time, 2.6% cancelled) and Maryland (5.4 km north-east, 89.8% on time, 2.4% cancelled), which are the stations on its network closest to Whitechapel.
Within 30 km of here, Elizabeth line runs best at Abbey Wood, 12.9 km east (94.9%), and worst at Ealing Broadway, 16.7 km west (82.9%).
The busiest Elizabeth line station within 30 km of Whitechapel is London Paddington, 8.1 km west, with about 644 scheduled stops a day.
Of the 2 operators with enough records at Whitechapel, Elizabeth line is the most punctual, at 92.2%.
For Elizabeth line, Whitechapel is the 8th best of 41 ranked stations. Its 92.2% here is 2.6 percentage points above the 89.6% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 17,606 | 93.1% | 2.1% |
| Period 6 of 2026-27 | 16,903 | 91.0% | 3.1% |
| Period 5 of 2026-27 | 17,600 | 89.3% | 4.9% |
| Period 4 of 2026-27 | 17,466 | 91.6% | 2.1% |
| Period 3 of 2026-27 | 16,925 | 89.8% | 2.3% |
| Period 2 of 2026-27 | 17,412 | 93.2% | 2.9% |
| Period 1 of 2026-27 | 20,063 | 92.9% | 2.6% |
| Period 13 of 2025-26 | 18,588 | 93.1% | 2.1% |
| Period 12 of 2025-26 | 17,452 | 94.2% | 0.9% |
| Period 11 of 2025-26 | 17,607 | 92.6% | 2.9% |
| Period 10 of 2025-26 | 15,718 | 94.7% | 1.9% |
| Period 9 of 2025-26 | 16,208 | 91.5% | 2.5% |
| Period 8 of 2025-26 | 17,316 | 91.5% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Whitechapel
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 209,633 | 89.8% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out