South Western Railway at Weymouth
All trains at WeymouthSouth Western Railway across BritainSouth West
How this operator is doing here
South Western Railway had 22,639 scheduled stops at Weymouth in the 13 periods to Period 7 of 2026-27, 79% of the station's total. 75.5% of recorded arrivals came within three minutes and 4.8% of stops were cancelled.
South Western Railway trains at Weymouth also serve Upwey (3.7 km north, 87.7% on time, 5.9% cancelled), Dorchester South (10.4 km north, 74.1% on time, 4.5% cancelled), Moreton (Dorset) (13.7 km north-east, 75.2% on time, 4.9% cancelled), Wool (18.0 km north-east, 71.1% on time, 4.8% cancelled), Wareham (Dorset) (25.4 km east, 70.5% on time, 4.1% cancelled) and Holton Heath (28.6 km east, 73.5% on time, 4.5% cancelled), which are the stations on its network closest to Weymouth.
Within 30 km of here, South Western Railway runs best at Upwey, 3.7 km north (87.7%), and worst at Wareham (Dorset), 25.4 km east (70.5%).
The busiest South Western Railway station within 30 km of Weymouth is Dorchester South, 10.4 km north, with about 62 scheduled stops a day.
Of the 2 operators with enough records at Weymouth, South Western Railway is the least punctual, at 75.5%.
For South Western Railway, Weymouth is the 147th best of 204 ranked stations. Its 75.5% here is 7.1 percentage points below the 82.6% across the whole network.
Period by period
See how South Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,704 | 74.2% | 4.2% |
| Period 6 of 2026-27 | 1,731 | 85.6% | 0.9% |
| Period 5 of 2026-27 | 1,732 | 76.7% | 4.3% |
| Period 4 of 2026-27 | 1,731 | 63.9% | 5.4% |
| Period 3 of 2026-27 | 1,635 | 71.1% | 5.9% |
| Period 2 of 2026-27 | 1,730 | 66.2% | 5.5% |
| Period 1 of 2026-27 | 1,999 | 83.3% | 2.8% |
| Period 13 of 2025-26 | 1,897 | 79.9% | 3.6% |
| Period 12 of 2025-26 | 1,726 | 78.0% | 6.9% |
| Period 11 of 2025-26 | 1,725 | 79.8% | 7.4% |
| Period 10 of 2025-26 | 1,545 | 75.0% | 3.6% |
| Period 9 of 2025-26 | 1,740 | 74.5% | 6.4% |
| Period 8 of 2025-26 | 1,744 | 70.6% | 5.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Weymouth
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 6,027 | 86.0% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out