Weymouth
WEYSouth WestManaged by South Western Railway
How this station is performing
Weymouth had 28,666 scheduled stops to Period 7 of 2026-27, about 79 a day. 77.7% of recorded arrivals were within three minutes of the timetable and 4.6% of scheduled stops were cancelled.
Weymouth opened on 20 January 1857, 169 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Dorchester South is the oldest (1847) and Upwey the newest (1871), with Weymouth in between.
The nearest stations to Weymouth are Upwey (3.7 km north), Dorchester South (10.4 km north), Dorchester West (10.6 km north), Moreton (Dorset) (13.7 km north-east) and Wool (18.0 km north-east). 1 stations lie within 10 km in all. Of the five, Upwey is the most punctual at 86.9% and Wool the least at 71.1%, with Weymouth on 77.7%.
Weymouth takes its name from a town called Weymouth, home to about 54,539 people, and the station stands 0.7 km from its centre.
2 operators call at Weymouth: South Western Railway (75.5%, 79% of stops) and Great Western Railway (86.0%, 21% of stops). The operator you travel with matters: Great Western Railway reaches 86.0% within three minutes while South Western Railway manages 75.5%, a gap of 10.5 percentage points.
Compared with 3 stations of a similar size in South West, Weymouth is the most punctual, at 77.7%. The comparison group includes Totnes (64.0%), Par (69.4%) and Worle (71.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 22,639 | 75.5% | 4.8% |
| Great Western Railway | 6,027 | 86.0% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Weymouth? Delay Repay
These operators call at Weymouth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,176 | 78.3% | 3.7% |
| Period 6 of 2026-27 | 2,215 | 86.1% | 1.4% |
| Period 5 of 2026-27 | 2,220 | 78.0% | 4.2% |
| Period 4 of 2026-27 | 2,219 | 66.5% | 5.0% |
| Period 3 of 2026-27 | 2,122 | 73.8% | 6.3% |
| Period 2 of 2026-27 | 2,208 | 70.1% | 5.3% |
| Period 1 of 2026-27 | 2,531 | 85.7% | 2.3% |
| Period 13 of 2025-26 | 2,281 | 81.3% | 3.4% |
| Period 12 of 2025-26 | 2,173 | 80.2% | 5.7% |
| Period 11 of 2025-26 | 2,135 | 81.4% | 6.6% |
| Period 10 of 2025-26 | 1,968 | 77.0% | 3.7% |
| Period 9 of 2025-26 | 2,204 | 76.6% | 6.5% |
| Period 8 of 2025-26 | 2,214 | 73.2% | 5.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out