GTR at West Hampstead Thameslink
All trains at West Hampstead ThameslinkGTR across BritainLondon
How this operator is doing here
GTR had 103,318 scheduled stops at West Hampstead Thameslink in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 75.5% of recorded arrivals came within three minutes and 6.0% of stops were cancelled.
GTR trains at West Hampstead Thameslink also serve Cricklewood (1.8 km north-west, 72.3% on time, 7.3% cancelled), Brent Cross West (3.3 km north-west, 74.0% on time, 7.1% cancelled), Kentish Town (3.7 km east, 83.3% on time, 6.8% cancelled), Hendon (4.7 km north-west, 75.8% on time, 7.4% cancelled), London St Pancras International (4.9 km east, 80.0% on time, 5.7% cancelled) and Shepherd's Bush (5.1 km south, 88.0% on time, 5.3% cancelled), which are the stations on its network closest to West Hampstead Thameslink.
Within 30 km of here, GTR runs best at Birkbeck, 18.7 km south-east (98.1%), and worst at Kenley, 25.7 km south (66.9%).
The busiest GTR station within 30 km of West Hampstead Thameslink is East Croydon, 20.4 km south, with about 813 scheduled stops a day.
Of the 1 operators with enough records at West Hampstead Thameslink, GTR is the most punctual, at 75.5%.
GTR at West Hampstead Thameslink has not moved in one direction over three full railway years: 81.8% within three minutes in 2023-24, 76.8% in 2024-25 and 77.1% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,211 | 73.3% | 4.8% |
| Period 6 of 2026-27 | 7,926 | 69.3% | 6.5% |
| Period 5 of 2026-27 | 7,700 | 72.4% | 9.1% |
| Period 4 of 2026-27 | 8,047 | 73.1% | 4.8% |
| Period 3 of 2026-27 | 6,375 | 75.0% | 5.2% |
| Period 2 of 2026-27 | 7,605 | 79.1% | 4.2% |
| Period 1 of 2026-27 | 9,093 | 80.6% | 4.3% |
| Period 13 of 2025-26 | 8,964 | 80.9% | 4.3% |
| Period 12 of 2025-26 | 8,222 | 78.6% | 4.8% |
| Period 11 of 2025-26 | 8,240 | 73.0% | 7.0% |
| Period 10 of 2025-26 | 6,776 | 77.7% | 7.9% |
| Period 9 of 2025-26 | 8,066 | 71.8% | 9.6% |
| Period 8 of 2025-26 | 8,093 | 75.1% | 5.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at West Hampstead Thameslink
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 11 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out