West Hampstead Thameslink
WHPLondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
West Hampstead Thameslink had 103,329 scheduled stops to Period 7 of 2026-27, about 284 a day. 75.5% of recorded arrivals were within three minutes of the timetable and 6.0% of scheduled stops were cancelled.
West Hampstead Thameslink opened on 1 March 1871, 155 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Kilburn High Road is the oldest (1852) and South Hampstead the newest (1922), with West Hampstead Thameslink in between.
The nearest stations to West Hampstead Thameslink are West Hampstead (0.2 km south), Finchley Road and Frognal (0.7 km east), Brondesbury (0.8 km south-west), Kilburn High Road (1.2 km south) and South Hampstead (1.2 km south-east). 103 stations lie within 10 km in all. Of the five, South Hampstead is the most punctual at 92.6% and Finchley Road and Frognal the least at 75.2%, with West Hampstead Thameslink on 75.5%.
West Hampstead Thameslink is named after West Hampstead, an area of London, home to about 33,751 people, but the station stands 0.7 km from its centre.
Compared with 3 stations of a similar size in London, West Hampstead Thameslink is the least punctual, at 75.5%. All of them are ahead, including West Ham (90.9%), Purley (80.7%) and Upminster (92.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 103,318 | 75.5% | 6.0% |
| East Midlands Railway | 11 | – | – |
Operators with their own page for this station are linked to it.
Late train at West Hampstead Thameslink? Delay Repay
These operators call at West Hampstead Thameslink and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,213 | 73.3% | 4.8% |
| Period 6 of 2026-27 | 7,926 | 69.3% | 6.5% |
| Period 5 of 2026-27 | 7,703 | 72.4% | 9.0% |
| Period 4 of 2026-27 | 8,048 | 73.1% | 4.8% |
| Period 3 of 2026-27 | 6,375 | 75.0% | 5.2% |
| Period 2 of 2026-27 | 7,606 | 79.1% | 4.2% |
| Period 1 of 2026-27 | 9,093 | 80.6% | 4.3% |
| Period 13 of 2025-26 | 8,964 | 80.9% | 4.3% |
| Period 12 of 2025-26 | 8,226 | 78.6% | 4.8% |
| Period 11 of 2025-26 | 8,240 | 73.0% | 7.0% |
| Period 10 of 2025-26 | 6,776 | 77.7% | 7.9% |
| Period 9 of 2025-26 | 8,066 | 71.8% | 9.6% |
| Period 8 of 2025-26 | 8,093 | 75.1% | 5.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out