Purley
PURLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
Purley had 103,731 scheduled stops to Period 7 of 2026-27, about 285 a day. 80.7% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Purley opened on 12 July 1841 and closed to passengers on 1 October 1847. It reopened on 5 August 1856, 170 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Purley is the oldest; the next oldest, Kenley, dates from 1856.
The nearest stations to Purley are Reedham (London) (1.0 km south-west), Riddlesdown (1.1 km south-east), Purley Oaks (1.5 km north-east), Kenley (1.7 km south-east) and Sanderstead (1.9 km north-east). 58 stations lie within 10 km in all. Of the five, Riddlesdown is the most punctual at 84.1% and Kenley the least at 66.9%, with Purley on 80.7%.
Purley is one of 2 stations named after a town called Purley; this one stands 0.0 km from its centre.
Purley has slipped a little, from 84.1% within three minutes in the previous 13 periods to 80.7% in the latest 13, a fall of 3.4 percentage points. Cancellations held steady at 3.6% of scheduled stops, against 4.1% before.
2 of 3 stations of a similar size in London are more punctual than Purley on 80.7%. The comparison group includes West Ham (90.9%), West Hampstead Thameslink (75.5%) and Upminster (92.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 103,731 | 80.7% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Purley? Delay Repay
These operators call at Purley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,857 | 79.9% | 3.3% |
| Period 6 of 2026-27 | 8,044 | 78.0% | 4.0% |
| Period 5 of 2026-27 | 7,936 | 76.9% | 4.5% |
| Period 4 of 2026-27 | 7,963 | 79.1% | 4.9% |
| Period 3 of 2026-27 | 7,672 | 79.3% | 3.2% |
| Period 2 of 2026-27 | 7,970 | 84.8% | 2.6% |
| Period 1 of 2026-27 | 9,198 | 86.9% | 1.9% |
| Period 13 of 2025-26 | 8,896 | 85.7% | 2.0% |
| Period 12 of 2025-26 | 7,969 | 78.2% | 4.6% |
| Period 11 of 2025-26 | 6,976 | 76.7% | 3.0% |
| Period 10 of 2025-26 | 7,209 | 82.1% | 4.0% |
| Period 9 of 2025-26 | 7,997 | 77.1% | 6.5% |
| Period 8 of 2025-26 | 8,044 | 82.6% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Ham | 103,458 | 90.9% | 2.1% |
| West Hampstead Thameslink | 103,329 | 75.5% | 6.0% |
| Upminster | 102,645 | 92.8% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out