West Dulwich
WDULondonManaged by Southeastern
How this station is performing
West Dulwich had 44,736 scheduled stops to Period 7 of 2026-27, about 123 a day. 81.3% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
West Dulwich opened on 21 September 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, West Norwood is the oldest (1856) and North Dulwich the newest (1868), with West Dulwich in between.
The nearest stations to West Dulwich are Tulse Hill (1.0 km west), Sydenham Hill (1.1 km south-east), West Norwood (1.3 km south-west), North Dulwich (1.5 km north) and Herne Hill (1.7 km north-west). 121 stations lie within 10 km in all. At 81.3%, West Dulwich is less punctual than all of them; the best of the five, North Dulwich, manages 95.2%.
West Dulwich takes its name from an area of London called West Dulwich, and the station stands 0.9 km from its centre.
Across the whole run of data, the weakest four-week period for West Dulwich was Period 9 of 2024-25, at 70.5%, some time before the latest year. The strongest was Period 1 of 2023-24, at 90.6%, and the two are 20.1 percentage points apart. Cancellations peaked at 5.8% of scheduled stops in Period 10 of 2024-25, against 2.6% over the latest 13 periods.
Compared with 3 stations of a similar size in London, West Dulwich is the least punctual, at 81.3%. All of them are ahead, including Sydenham Hill (83.9%), Penge East (84.5%) and Kent House (85.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 44,736 | 81.3% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at West Dulwich? Delay Repay
These operators call at West Dulwich and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,531 | 81.5% | 1.7% |
| Period 6 of 2026-27 | 3,616 | 79.2% | 2.8% |
| Period 5 of 2026-27 | 2,560 | 71.4% | 2.7% |
| Period 4 of 2026-27 | 3,705 | 84.7% | 2.5% |
| Period 3 of 2026-27 | 3,666 | 79.8% | 4.1% |
| Period 2 of 2026-27 | 3,526 | 83.2% | 3.6% |
| Period 1 of 2026-27 | 4,028 | 89.0% | 1.5% |
| Period 13 of 2025-26 | 4,013 | 87.3% | 1.3% |
| Period 12 of 2025-26 | 3,671 | 83.6% | 1.7% |
| Period 11 of 2025-26 | 3,708 | 83.1% | 1.6% |
| Period 10 of 2025-26 | 2,267 | 75.4% | 4.8% |
| Period 9 of 2025-26 | 3,132 | 76.3% | 3.0% |
| Period 8 of 2025-26 | 3,313 | 74.4% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Sydenham Hill | 44,737 | 83.9% | 2.6% |
| Penge East | 44,750 | 84.5% | 2.6% |
| Kent House | 44,792 | 85.3% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out