Penge East
PNELondonManaged by Southeastern
How this station is performing
Penge East had 44,750 scheduled stops to Period 7 of 2026-27, about 123 a day. 84.5% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Penge East opened on 1 July 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Sydenham (London) is the oldest (1839) and Kent House the newest (1884), with Penge East in between.
The nearest stations to Penge East are Penge West (0.5 km south-west), Sydenham (London) (0.9 km north), Kent House (1.0 km south-east), Anerley (1.1 km south-west) and Crystal Palace (1.2 km west). 100 stations lie within 10 km in all. At 84.5%, Penge East is less punctual than all of them; the best of the five, Crystal Palace, manages 93.8%.
Penge East is named after Penge, an area of London, but the station stands 0.8 km from its centre.
Across the whole run of data, the weakest four-week period for Penge East was Period 10 of 2023-24, at 71.3%, some time before the latest year. The strongest was Period 1 of 2026-27, at 91.8%, and the two are 20.5 percentage points apart. Cancellations peaked at 5.8% of scheduled stops in Period 10 of 2024-25, against 2.6% over the latest 13 periods.
1 of 3 stations of a similar size in London are more punctual than Penge East on 84.5%. The comparison group includes Sydenham Hill (83.9%), West Dulwich (81.3%) and Kent House (85.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 44,750 | 84.5% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Penge East? Delay Repay
These operators call at Penge East and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,537 | 85.1% | 1.8% |
| Period 6 of 2026-27 | 3,616 | 83.4% | 2.8% |
| Period 5 of 2026-27 | 2,560 | 75.5% | 2.7% |
| Period 4 of 2026-27 | 3,709 | 87.7% | 2.5% |
| Period 3 of 2026-27 | 3,670 | 83.1% | 4.0% |
| Period 2 of 2026-27 | 3,526 | 86.5% | 3.6% |
| Period 1 of 2026-27 | 4,028 | 91.8% | 1.5% |
| Period 13 of 2025-26 | 4,013 | 89.9% | 1.4% |
| Period 12 of 2025-26 | 3,671 | 86.3% | 1.7% |
| Period 11 of 2025-26 | 3,708 | 86.2% | 1.6% |
| Period 10 of 2025-26 | 2,267 | 79.2% | 4.9% |
| Period 9 of 2025-26 | 3,132 | 78.5% | 3.1% |
| Period 8 of 2025-26 | 3,313 | 77.2% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Sydenham Hill | 44,737 | 83.9% | 2.6% |
| West Dulwich | 44,736 | 81.3% | 2.6% |
| Kent House | 44,792 | 85.3% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out