Wennington
WNNNorth WestManaged by Northern Trains
How this station is performing
Wennington has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,518 scheduled stops, about 15 a day. In those periods 83.4% of stops arrived within three minutes of the timetable and 0.9% of scheduled stops were cancelled.
Wennington opened on 17 November 1849. It was moved to the site it uses now on 2 May 1850. Among the 5 stations nearest to it with a known opening date, Carnforth is the oldest (1846) and Silverdale the newest (1857), with Wennington in between.
The nearest stations to Wennington are Bentham (5.1 km east), Clapham (North Yorkshire) (11.8 km east), Carnforth (12.0 km west), Silverdale (15.0 km west) and Lancaster (16.6 km south-west). 1 stations lie within 10 km in all. At 83.4%, Wennington is more punctual than every one of them; the best of the five, Bentham, manages 82.1%.
Wennington is one of 3 stations named after a Village called Wennington, home to about 178 people; this one stands 0.1 km from its centre.
Compared with 3 stations of a similar size in North West, Wennington is the most punctual, at 83.4%. The comparison group includes Garsdale (77.3%), Appleby (76.2%) and Kirkby Stephen (77.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 5,518 | 83.4% | 0.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 424 | 84.7% | 0.5% |
| Period 6 of 2026-27 | 424 | 84.7% | 0.5% |
| Period 5 of 2026-27 | 424 | 85.1% | 0.5% |
| Period 4 of 2026-27 | 424 | 84.6% | 0.9% |
| Period 3 of 2026-27 | 424 | 84.5% | 0.5% |
| Period 2 of 2026-27 | 424 | 83.5% | 0.5% |
| Period 1 of 2026-27 | 452 | – | 0.0% |
| Period 13 of 2025-26 | 466 | 90.8% | 2.1% |
| Period 12 of 2025-26 | 424 | 87.9% | 0.2% |
| Period 11 of 2025-26 | 424 | 90.1% | 1.9% |
| Period 10 of 2025-26 | 360 | 84.3% | 1.1% |
| Period 9 of 2025-26 | 424 | 72.1% | 1.9% |
| Period 8 of 2025-26 | 424 | 68.0% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Garsdale | 5,611 | 77.3% | 0.9% |
| Appleby | 5,657 | 76.2% | 1.0% |
| Kirkby Stephen | 5,657 | 77.6% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out