Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Kirkby Stephen

KSWNorth WestManaged by Northern Trains

On time, last 13 periods77.6%Great Britain: 83.6%
Cancelled1.0%Great Britain: 3.2%
Stops a day16Scheduled, on average
Punctuality rank1666th of 2,374Among ranked stations

How this station is performing

Kirkby Stephen had 5,657 scheduled stops to Period 7 of 2026-27, about 16 a day. 77.6% of recorded arrivals were within three minutes of the timetable and 1.0% of scheduled stops were cancelled.

Kirkby Stephen opened on 1 May 1876 and closed to passengers on 4 May 1970. It reopened on 14 July 1986, 40 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Kendal is the oldest (1846) and Dent the newest (1877), with Kirkby Stephen in between.

Kirkby Stephen is remote: its nearest neighbours are Garsdale (15.1 km south), Appleby (15.9 km north-west), Dent (19.2 km south), Kendal (27.6 km south-west) and Ribblehead (27.7 km south). Of the five, Kendal is the most punctual at 86.3% and Ribblehead the least at 75.8%, with Kirkby Stephen on 77.6%.

Kirkby Stephen takes its name from a market town called Kirkby Stephen, home to about 1,894 people, and the station stands 2.3 km from its centre.

Across the whole run of data, the weakest four-week period for Kirkby Stephen was Period 3 of 2024-25, at 48.1%, some time before the latest year. The strongest was Period 13 of 2024-25, at 89.9%, and the two are 41.8 percentage points apart. Cancellations peaked at 6.3% of scheduled stops in Period 11 of 2023-24, against 1.0% over the latest 13 periods.

1 of 3 stations of a similar size in North West are more punctual than Kirkby Stephen on 77.6%. The comparison group includes Appleby (76.2%), Garsdale (77.3%) and Wennington (83.4%).

Period by period

60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 88.5%Period 2 of 2023-24: 83.2%Period 3 of 2023-24: 82.1%Period 4 of 2023-24: 82.4%Period 5 of 2023-24: 82.4%Period 6 of 2023-24: 84.9%Period 7 of 2023-24: 78.4%Period 8 of 2023-24: 67.2%Period 9 of 2023-24: 62.4%Period 10 of 2023-24: 78.4%Period 11 of 2023-24: 69.5%Period 12 of 2023-24: 69.7%Period 13 of 2023-24: 84.2%Period 1 of 2024-25: 79.9%Period 2 of 2024-25: 76.3%Period 3 of 2024-25: 48.1%Period 4 of 2024-25: 48.1%Period 5 of 2024-25: 54.8%Period 6 of 2024-25: 76.5%Period 7 of 2024-25: 65.1%Period 8 of 2024-25: 62.5%Period 9 of 2024-25: 72.5%Period 10 of 2024-25: 83.4%Period 11 of 2024-25: 84.8%Period 12 of 2024-25: 87.5%Period 13 of 2024-25: 89.9%Period 1 of 2025-26: 87.9%Period 2 of 2025-26: 82.9%Period 3 of 2025-26: 82.3%Period 4 of 2025-26: 79.9%Period 5 of 2025-26: 79.7%Period 6 of 2025-26: 81.2%Period 7 of 2025-26: 76.2%Period 8 of 2025-26: 65.9%Period 9 of 2025-26: 71.3%Period 10 of 2025-26: 75.7%Period 11 of 2025-26: 83.9%Period 12 of 2025-26: 82.1%Period 13 of 2025-26: 82.8%Period 1 of 2026-27: 77.3%Period 2 of 2026-27: 71.8%Period 3 of 2026-27: 78.8%Period 4 of 2026-27: 80.2%Period 5 of 2026-27: 81.4%Period 6 of 2026-27: 82.2%Period 7 of 2026-27: 74.7%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 0.4%Period 2 of 2023-24: 2.0%Period 3 of 2023-24: 2.3%Period 4 of 2023-24: 2.5%Period 5 of 2023-24: 4.3%Period 6 of 2023-24: 0.0%Period 7 of 2023-24: 1.6%Period 8 of 2023-24: 2.5%Period 9 of 2023-24: 4.8%Period 10 of 2023-24: 2.0%Period 11 of 2023-24: 6.3%Period 12 of 2023-24: 0.7%Period 13 of 2023-24: 0.2%Period 1 of 2024-25: 1.5%Period 2 of 2024-25: 2.6%Period 3 of 2024-25: 1.9%Period 4 of 2024-25: 2.3%Period 5 of 2024-25: 1.6%Period 6 of 2024-25: 3.5%Period 7 of 2024-25: 1.9%Period 8 of 2024-25: 1.2%Period 9 of 2024-25: 3.2%Period 10 of 2024-25: 1.8%Period 11 of 2024-25: 3.3%Period 12 of 2024-25: 0.2%Period 13 of 2024-25: 0.7%Period 1 of 2025-26: 0.6%Period 2 of 2025-26: 1.2%Period 3 of 2025-26: 2.1%Period 4 of 2025-26: 1.2%Period 5 of 2025-26: 2.1%Period 6 of 2025-26: 0.5%Period 7 of 2025-26: 0.0%Period 8 of 2025-26: 0.9%Period 9 of 2025-26: 1.6%Period 10 of 2025-26: 0.0%Period 11 of 2025-26: 0.9%Period 12 of 2025-26: 3.0%Period 13 of 2025-26: 0.0%Period 1 of 2026-27: 0.6%Period 2 of 2026-27: 3.5%Period 3 of 2026-27: 0.5%Period 4 of 2026-27: 0.7%Period 5 of 2026-27: 0.5%Period 6 of 2026-27: 0.0%Period 7 of 2026-27: 0.5%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Northern5,65777.6%1.0%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2743274.7%0.5%
Period 6 of 2026-2743282.2%0.0%
Period 5 of 2026-2743281.4%0.5%
Period 4 of 2026-2743280.2%0.7%
Period 3 of 2026-2743278.8%0.5%
Period 2 of 2026-2742771.8%3.5%
Period 1 of 2026-2749677.3%0.6%
Period 13 of 2025-2647682.8%0.0%
Period 12 of 2025-2643282.1%3.0%
Period 11 of 2025-2643283.9%0.9%
Period 10 of 2025-2637075.7%0.0%
Period 9 of 2025-2643271.3%1.6%
Period 8 of 2025-2643265.9%0.9%

Time of year

60%70%80%90%P1: 83.1%1P2: 78.5%2P3: 72.6%3P4: 72.5%4P5: 74.5%5P6: 81.1%6P7: 73.4%7P8: 65.2%8P9: 68.9%9P10: 79.2%10P11: 79.5%11P12: 79.9%12P13: 85.6%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in North West

StationScheduled stopsWithin 3 minCancelled
Appleby5,65776.2%1.0%
Garsdale5,61177.3%0.9%
Wennington5,51883.4%0.9%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out