Garsdale
GSDNorth WestManaged by Northern Trains
How this station is performing
Garsdale has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,611 scheduled stops, about 15 a day. In those periods 77.3% of stops arrived within three minutes of the timetable and 0.9% of scheduled stops were cancelled.
Garsdale opened on 1 August 1876 and closed to passengers on 4 May 1970. It reopened on 14 July 1986, 40 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Clapham (North Yorkshire) is the oldest (1849) and Dent the newest (1877), with Garsdale in between.
The nearest stations to Garsdale are Dent (5.0 km south-west), Ribblehead (13.1 km south), Kirkby Stephen (15.1 km north), Horton-in-Ribblesdale (19.2 km south) and Clapham (North Yorkshire) (24.6 km south). 1 stations lie within 10 km in all. Of the five, Clapham (North Yorkshire) is the most punctual at 82.0% and Ribblehead the least at 75.8%, with Garsdale on 77.3%.
Across the whole run of data, the weakest four-week period for Garsdale was Period 3 of 2024-25, at 52.2%, some time before the latest year. The strongest was Period 13 of 2024-25, at 89.0%, and the two are 36.8 percentage points apart. Cancellations peaked at 6.4% of scheduled stops in Period 11 of 2023-24, against 0.9% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Garsdale on 77.3%. The comparison group includes Appleby (76.2%), Kirkby Stephen (77.6%) and Wennington (83.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 5,611 | 77.3% | 0.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 428 | 72.6% | 0.5% |
| Period 6 of 2026-27 | 428 | 81.9% | 0.0% |
| Period 5 of 2026-27 | 428 | 82.6% | 0.5% |
| Period 4 of 2026-27 | 428 | 79.3% | 0.7% |
| Period 3 of 2026-27 | 428 | 76.4% | 0.5% |
| Period 2 of 2026-27 | 429 | 72.9% | 3.5% |
| Period 1 of 2026-27 | 492 | – | 0.6% |
| Period 13 of 2025-26 | 471 | 82.8% | 0.0% |
| Period 12 of 2025-26 | 428 | 82.6% | 2.8% |
| Period 11 of 2025-26 | 428 | 83.1% | 0.9% |
| Period 10 of 2025-26 | 367 | 74.8% | 0.0% |
| Period 9 of 2025-26 | 428 | 69.6% | 1.6% |
| Period 8 of 2025-26 | 428 | 68.2% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Appleby | 5,657 | 76.2% | 1.0% |
| Kirkby Stephen | 5,657 | 77.6% | 1.0% |
| Wennington | 5,518 | 83.4% | 0.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out