Welling
WLILondonManaged by Southeastern
How this station is performing
Welling had 66,467 scheduled stops to Period 7 of 2026-27, about 183 a day. 86.0% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Welling opened on 1 May 1895, 131 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Abbey Wood is the oldest (1849) and Falconwood the newest (1936), with Welling in between.
The nearest stations to Welling are Falconwood (1.7 km west), Bexleyheath (2.2 km east), Plumstead (3.0 km north-west), Abbey Wood (3.1 km north-east) and Sidcup (3.4 km south). 59 stations lie within 10 km in all. Of the five, Abbey Wood is the most punctual at 93.0% and Bexleyheath the least at 84.1%, with Welling on 86.0%.
Welling takes its name from an area of London called Welling, home to about 41,000 people, and the station stands 0.8 km from its centre.
Across the whole run of data, the weakest four-week period for Welling was Period 9 of 2024-25, at 73.7%, some time before the latest year. The strongest was Period 1 of 2023-24, at 92.1%, and the two are 18.4 percentage points apart. Cancellations peaked at 5.5% of scheduled stops in Period 2 of 2026-27, against 2.0% over the latest 13 periods.
1 of 3 stations of a similar size in London are more punctual than Welling on 86.0%. The comparison group includes Kidbrooke (85.1%), Falconwood (86.5%) and Bexleyheath (84.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 66,467 | 86.0% | 2.0% |
Operators with their own page for this station are linked to it.
Late train at Welling? Delay Repay
These operators call at Welling and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,984 | 86.0% | 1.5% |
| Period 6 of 2026-27 | 5,148 | 84.4% | 1.2% |
| Period 5 of 2026-27 | 4,708 | 84.7% | 2.7% |
| Period 4 of 2026-27 | 5,282 | 88.5% | 1.5% |
| Period 3 of 2026-27 | 5,373 | 84.6% | 3.1% |
| Period 2 of 2026-27 | 4,983 | 84.7% | 5.5% |
| Period 1 of 2026-27 | 6,065 | 89.2% | 1.9% |
| Period 13 of 2025-26 | 5,206 | 86.5% | 1.4% |
| Period 12 of 2025-26 | 5,554 | 86.5% | 1.7% |
| Period 11 of 2025-26 | 4,853 | 86.1% | 1.2% |
| Period 10 of 2025-26 | 4,107 | 86.7% | 1.7% |
| Period 9 of 2025-26 | 5,251 | 84.8% | 1.3% |
| Period 8 of 2025-26 | 4,953 | 84.2% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kidbrooke | 66,468 | 85.1% | 2.1% |
| Falconwood | 66,469 | 86.5% | 2.0% |
| Bexleyheath | 66,868 | 84.1% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out