GTR had 17,138 scheduled stops at Watlington in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 62.7% of recorded arrivals came within three minutes and 10.0% of stops were cancelled.
GTR trains at Watlington also serve Downham Market (7.7 km south, 64.2% on time, 10.0% cancelled), Kings Lynn (9.2 km north, 65.1% on time, 9.8% cancelled), Littleport (23.8 km south, 65.2% on time, 9.9% cancelled), Ely (32.3 km south, 66.9% on time, 10.7% cancelled), Peterborough (44.1 km west, 79.8% on time, 4.5% cancelled) and Waterbeach (47.3 km south, 68.1% on time, 10.5% cancelled), which are the stations on its network closest to Watlington.
Within 30 km of here, GTR runs best at Littleport, 23.8 km south (65.2%), and worst at Downham Market, 7.7 km south (64.2%).
The busiest GTR station within 30 km of Watlington is Kings Lynn, 9.2 km north, with about 47 scheduled stops a day.
GTR at Watlington has slipped sharply. 62.7% of stops came within three minutes of the timetable in the latest 13 periods, 10.4 percentage points worse than the 73.1% recorded in the 13 before. Cancellations rose to 10.0% of scheduled stops from 6.8%, which is 3.2 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,254 | 50.7% | 8.4% |
| Period 6 of 2026-27 | 1,408 | 58.1% | 24.4% |
| Period 5 of 2026-27 | 1,299 | 63.2% | 14.4% |
| Period 4 of 2026-27 | 1,392 | 49.9% | 17.3% |
| Period 3 of 2026-27 | 1,295 | 63.5% | 9.5% |
| Period 2 of 2026-27 | 1,176 | 57.2% | 10.0% |
| Period 1 of 2026-27 | 1,327 | 64.4% | 7.4% |
| Period 13 of 2025-26 | 1,518 | 65.5% | 7.1% |
| Period 12 of 2025-26 | 1,419 | 67.0% | 5.9% |
| Period 11 of 2025-26 | 1,416 | 61.4% | 6.8% |
| Period 10 of 2025-26 | 1,178 | 70.8% | 4.8% |
| Period 9 of 2025-26 | 1,356 | 73.3% | 8.0% |
| Period 8 of 2025-26 | 1,100 | 68.3% | 4.5% |