South Western Railway at Warminster
All trains at WarminsterSouth Western Railway across BritainSouth West
How this operator is doing here
South Western Railway had 2,327 scheduled stops at Warminster in the 13 periods to Period 7 of 2026-27, 10% of the station's total. 79.1% of recorded arrivals came within three minutes and 6.5% of stops were cancelled.
South Western Railway trains at Warminster also serve Westbury (6.8 km north, 72.6% on time, 7.0% cancelled), Frome (9.5 km west, 77.6% on time, 7.5% cancelled), Tisbury (17.6 km south-east, 65.6% on time, 3.2% cancelled), Gillingham (Dorset) (20.3 km south, 62.7% on time, 3.1% cancelled), Bruton (21.6 km south-west, 78.9% on time, 7.7% cancelled) and Castle Cary (26.9 km south-west, 77.1% on time, 7.8% cancelled), which are the stations on its network closest to Warminster.
Within 30 km of here, South Western Railway runs best at Salisbury, 30.0 km south-east (72.7%), and worst at Gillingham (Dorset), 20.3 km south (62.7%).
The busiest South Western Railway station within 30 km of Warminster is Salisbury, 30.0 km south-east, with about 109 scheduled stops a day.
Of the 2 operators with enough records at Warminster, South Western Railway is the most punctual, at 79.1%.
Over three full railway years South Western Railway at Warminster has improved each time, from 74.5% within three minutes in 2023-24 to 80.0% in 2024-25 and 80.6% in 2025-26.
Period by period
See how South Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 178 | 69.8% | 5.1% |
| Period 6 of 2026-27 | 179 | 73.8% | 3.9% |
| Period 5 of 2026-27 | 184 | 79.2% | 3.3% |
| Period 4 of 2026-27 | 183 | 74.6% | 7.7% |
| Period 3 of 2026-27 | 160 | 80.1% | 5.6% |
| Period 2 of 2026-27 | 177 | 80.0% | 15.3% |
| Period 1 of 2026-27 | 205 | 86.2% | 8.3% |
| Period 13 of 2025-26 | 201 | 86.0% | 4.0% |
| Period 12 of 2025-26 | 178 | 85.0% | 6.2% |
| Period 11 of 2025-26 | 179 | 86.2% | 2.8% |
| Period 10 of 2025-26 | 144 | 81.8% | 8.3% |
| Period 9 of 2025-26 | 186 | 75.6% | 9.7% |
| Period 8 of 2025-26 | 173 | 68.3% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Warminster
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 20,893 | 71.4% | 5.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out