Great Western Railway at Warminster
All trains at WarminsterGreat Western Railway across BritainSouth West
How this operator is doing here
Great Western Railway had 20,893 scheduled stops at Warminster in the 13 periods to Period 7 of 2026-27, 90% of the station's total. 71.4% of recorded arrivals came within three minutes and 5.4% of stops were cancelled.
Great Western Railway trains at Warminster also serve Dilton Marsh (5.1 km north-west, – on time, 7.0% cancelled), Westbury (6.8 km north, 69.5% on time, 4.5% cancelled), Frome (9.5 km west, 69.3% on time, 4.9% cancelled), Trowbridge (12.9 km north, 74.3% on time, 4.7% cancelled), Bradford-on-Avon (16.2 km north, 71.4% on time, 4.5% cancelled) and Avoncliff (16.4 km north-west, 77.6% on time, 4.9% cancelled), which are the stations on its network closest to Warminster.
Within 30 km of here, Great Western Railway runs best at Avoncliff, 16.4 km north-west (77.6%), and worst at Castle Cary, 26.9 km south-west (54.0%).
The busiest Great Western Railway station within 30 km of Warminster is Bath Spa, 22.7 km north-west, with about 157 scheduled stops a day.
Great Western Railway at Warminster has slipped a little, from 75.8% within three minutes in the previous 13 periods to 71.4% in the latest 13, a fall of 4.4 percentage points. Cancellations fell to 5.4% of scheduled stops from 6.8%, which is 1.4 percentage points fewer.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,586 | 66.8% | 4.4% |
| Period 6 of 2026-27 | 1,618 | 67.1% | 3.6% |
| Period 5 of 2026-27 | 1,491 | 66.4% | 6.7% |
| Period 4 of 2026-27 | 1,622 | 62.3% | 8.2% |
| Period 3 of 2026-27 | 1,547 | 71.9% | 8.9% |
| Period 2 of 2026-27 | 1,592 | 70.1% | 7.7% |
| Period 1 of 2026-27 | 1,812 | 78.7% | 3.1% |
| Period 13 of 2025-26 | 1,773 | 74.2% | 3.5% |
| Period 12 of 2025-26 | 1,588 | 82.9% | 2.6% |
| Period 11 of 2025-26 | 1,621 | 83.7% | 4.1% |
| Period 10 of 2025-26 | 1,472 | 71.1% | 4.8% |
| Period 9 of 2025-26 | 1,637 | 63.1% | 5.6% |
| Period 8 of 2025-26 | 1,534 | 67.5% | 8.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Warminster
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 2,327 | 79.1% | 6.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out