Wareham (Dorset)
WRMSouth WestManaged by South Western Railway
How this station is performing
Wareham (Dorset) had 22,143 scheduled stops to Period 7 of 2026-27, about 61 a day. 70.5% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Wareham (Dorset) opened on 1 June 1847. It was moved to the site it uses now on 4 April 1887. Of the 5 stations nearest to it with a known opening date, Wareham (Dorset) is the oldest; the next oldest, Wool, dates from 1847.
The nearest stations to Wareham (Dorset) are Holton Heath (3.3 km north-east), Wool (7.5 km west), Hamworthy (7.7 km north-east), Poole (9.7 km east) and Parkstone (Dorset) (12.3 km east). 4 stations lie within 10 km in all. At 70.5%, Wareham (Dorset) is less punctual than all of them; the best of the five, Parkstone (Dorset), manages 74.0%.
Wareham (Dorset) is named after Wareham, a market town, home to about 5,877 people, but the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Wareham (Dorset) was Period 9 of 2024-25, at 52.3%, some time before the latest year. The strongest was Period 12 of 2024-25, at 83.3%, and the two are 31.0 percentage points apart. Cancellations peaked at 9.2% of scheduled stops in Period 9 of 2024-25, against 4.1% over the latest 13 periods.
2 of 3 stations of a similar size in South West are more punctual than Wareham (Dorset) on 70.5%. The comparison group includes Hamworthy (70.7%), St Austell (66.6%) and Oldfield Park (74.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 22,143 | 70.5% | 4.1% |
Operators with their own page for this station are linked to it.
Late train at Wareham (Dorset)? Delay Repay
These operators call at Wareham (Dorset) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,704 | 66.7% | 4.4% |
| Period 6 of 2026-27 | 1,724 | 78.6% | 1.5% |
| Period 5 of 2026-27 | 1,732 | 68.3% | 4.4% |
| Period 4 of 2026-27 | 1,693 | 59.1% | 4.8% |
| Period 3 of 2026-27 | 1,622 | 69.0% | 5.5% |
| Period 2 of 2026-27 | 1,730 | 64.0% | 5.3% |
| Period 1 of 2026-27 | 1,999 | 81.9% | 2.7% |
| Period 13 of 2025-26 | 1,898 | 76.4% | 3.0% |
| Period 12 of 2025-26 | 1,728 | 75.6% | 5.3% |
| Period 11 of 2025-26 | 1,725 | 77.4% | 6.0% |
| Period 10 of 2025-26 | 1,545 | 72.1% | 3.0% |
| Period 9 of 2025-26 | 1,299 | 60.5% | 3.2% |
| Period 8 of 2025-26 | 1,744 | 62.1% | 4.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hamworthy | 22,002 | 70.7% | 4.2% |
| St Austell | 22,333 | 66.6% | 5.9% |
| Oldfield Park | 21,842 | 74.9% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out