How this operator is doing here
CrossCountry had 10,385 scheduled stops at Wakefield Westgate in the 13 periods to Period 7 of 2026-27, 13% of the station's total. 53.4% of recorded arrivals came within three minutes and 4.9% of stops were cancelled.
CrossCountry trains at Wakefield Westgate also serve Leeds (12.8 km north, 61.3% on time, 4.8% cancelled), Doncaster (30.0 km south-east, 57.1% on time, 5.7% cancelled), Sheffield (33.9 km south, 51.7% on time, 3.4% cancelled), York (40.9 km north-east, 58.4% on time, 3.6% cancelled), Chesterfield (49.7 km south, 54.2% on time, 2.6% cancelled) and Manchester Piccadilly (53.0 km south-west, 60.6% on time, 6.5% cancelled), which are the stations on its network closest to Wakefield Westgate.
The busiest CrossCountry station within 30 km of Wakefield Westgate is Leeds, 12.8 km north, with about 30 scheduled stops a day.
Of the 3 operators with enough records at Wakefield Westgate, CrossCountry is the least punctual, at 53.4%.
For CrossCountry, Wakefield Westgate is the 95th best of 99 ranked stations. Its 53.4% here is 9.8 percentage points below the 63.2% across the whole network.
CrossCountry at Wakefield Westgate has slipped a little, from 58.1% within three minutes in the previous 13 periods to 53.4% in the latest 13, a fall of 4.7 percentage points. Cancellations rose to 4.9% of scheduled stops from 3.8%, which is 1.1 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 837 | 53.8% | 5.1% |
| Period 6 of 2026-27 | 858 | 51.2% | 6.8% |
| Period 5 of 2026-27 | 800 | 51.3% | 6.9% |
| Period 4 of 2026-27 | 880 | 52.6% | 5.8% |
| Period 3 of 2026-27 | 740 | 50.8% | 3.5% |
| Period 2 of 2026-27 | 762 | 44.3% | 3.7% |
| Period 1 of 2026-27 | 973 | 58.7% | 3.1% |
| Period 13 of 2025-26 | 951 | 61.2% | 2.9% |
| Period 12 of 2025-26 | 751 | 51.9% | 3.3% |
| Period 11 of 2025-26 | 494 | 59.2% | 8.7% |
| Period 10 of 2025-26 | 674 | 54.4% | 7.1% |
| Period 9 of 2025-26 | 820 | 46.9% | 5.5% |
| Period 8 of 2025-26 | 845 | 57.5% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Wakefield Westgate
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 46,744 | 69.5% | 4.2% |
| LNER | 22,723 | 64.7% | 3.7% |
| Grand Central | 3 | – | – |