TransPennine Express at Wakefield Kirkgate
All trains at Wakefield KirkgateTransPennine Express across BritainYorkshire and The Humber
How this operator is doing here
TransPennine Express had 12,433 scheduled stops at Wakefield Kirkgate in the 13 periods to Period 7 of 2026-27, 21% of the station's total. 72.5% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.
TransPennine Express trains at Wakefield Kirkgate also serve Normanton (4.9 km north-east, 71.7% on time, 2.3% cancelled), Batley (9.5 km west, 75.8% on time, 2.0% cancelled), Dewsbury (9.7 km west, 66.1% on time, 2.4% cancelled), Castleford (10.1 km north-east, 73.6% on time, 2.1% cancelled), Morley (10.4 km north-west, 76.4% on time, 2.0% cancelled) and Ravensthorpe (11.0 km west, – on time, – cancelled), which are the stations on its network closest to Wakefield Kirkgate.
Within 30 km of here, TransPennine Express runs best at Castleford, 10.1 km north-east (73.6%), and worst at Meadowhall, 29.5 km south (59.7%).
The busiest TransPennine Express station within 30 km of Wakefield Kirkgate is Leeds, 13.4 km north, with about 141 scheduled stops a day.
TransPennine Express at Wakefield Kirkgate improved sharply over the past year. In the latest 13 periods 72.5% of stops came within three minutes of the timetable, up 9.2 percentage points from 63.3% in the 13 before. Cancellations held steady at 2.2% of scheduled stops, against 1.8% before.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 864 | 76.4% | 2.0% |
| Period 6 of 2026-27 | 947 | 69.1% | 1.3% |
| Period 5 of 2026-27 | 939 | 69.8% | 3.9% |
| Period 4 of 2026-27 | 939 | 66.3% | 1.5% |
| Period 3 of 2026-27 | 944 | 77.7% | 3.3% |
| Period 2 of 2026-27 | 912 | 81.5% | 3.0% |
| Period 1 of 2026-27 | 1,083 | 79.6% | 1.5% |
| Period 13 of 2025-26 | 1,182 | 77.7% | 1.1% |
| Period 12 of 2025-26 | 950 | 72.8% | 1.7% |
| Period 11 of 2025-26 | 905 | 77.9% | 4.2% |
| Period 10 of 2025-26 | 861 | 71.5% | 0.7% |
| Period 9 of 2025-26 | 952 | 57.0% | 2.9% |
| Period 8 of 2025-26 | 955 | 63.5% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Wakefield Kirkgate
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 44,272 | 77.8% | 2.2% |
| Grand Central | 2,823 | 60.3% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out