Northern at Wakefield Kirkgate
All trains at Wakefield KirkgateNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 44,272 scheduled stops at Wakefield Kirkgate in the 13 periods to Period 7 of 2026-27, 74% of the station's total. 77.8% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.
Northern trains at Wakefield Kirkgate also serve Wakefield Westgate (1.2 km west, 69.5% on time, 4.2% cancelled), Sandal and Agbrigg (1.9 km south, 70.8% on time, 2.3% cancelled), Outwood (4.3 km north, 72.4% on time, 2.1% cancelled), Normanton (4.9 km north-east, 83.3% on time, 1.7% cancelled), Streethouse (5.9 km east, 76.5% on time, 2.8% cancelled) and Featherstone (8.6 km east, 75.5% on time, 2.8% cancelled), which are the stations on its network closest to Wakefield Kirkgate.
Within 30 km of here, Northern runs best at Bradford Forster Square, 21.8 km north-west (93.3%), and worst at Sowerby Bridge, 27.8 km west (58.5%).
The busiest Northern station within 30 km of Wakefield Kirkgate is Leeds, 13.4 km north, with about 780 scheduled stops a day.
Of the 3 operators with enough records at Wakefield Kirkgate, Northern is the most punctual, at 77.8%.
For Northern, Wakefield Kirkgate is the 289th best of 493 ranked stations. Its 77.8% here is 0.8 percentage points below the 78.6% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,396 | 80.2% | 1.8% |
| Period 6 of 2026-27 | 3,396 | 81.5% | 1.4% |
| Period 5 of 2026-27 | 3,396 | 76.6% | 2.1% |
| Period 4 of 2026-27 | 3,379 | 78.2% | 5.5% |
| Period 3 of 2026-27 | 3,397 | 75.3% | 3.1% |
| Period 2 of 2026-27 | 3,396 | 77.4% | 2.8% |
| Period 1 of 2026-27 | 3,919 | 81.9% | 1.3% |
| Period 13 of 2025-26 | 3,704 | 83.8% | 1.3% |
| Period 12 of 2025-26 | 3,049 | 76.0% | 2.8% |
| Period 11 of 2025-26 | 3,382 | 79.8% | 1.4% |
| Period 10 of 2025-26 | 3,074 | 77.4% | 1.9% |
| Period 9 of 2025-26 | 3,392 | 68.2% | 2.0% |
| Period 8 of 2025-26 | 3,392 | 74.0% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Wakefield Kirkgate
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 12,433 | 72.5% | 2.2% |
| Grand Central | 2,823 | 60.3% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out