Wadhurst
WADSouth EastManaged by Southeastern
How this station is performing
Wadhurst had 25,643 scheduled stops to Period 7 of 2026-27, about 70 a day. 75.6% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Wadhurst opened on 1 September 1851, 175 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Tunbridge Wells is the oldest (1845) and High Brooms the newest (1893), with Wadhurst in between.
The nearest stations to Wadhurst are Frant (3.7 km north), Stonegate (6.9 km south-east), Tunbridge Wells (7.2 km north-west), Eridge (8.0 km west) and High Brooms (8.8 km north). 6 stations lie within 10 km in all. At 75.6%, Wadhurst is more punctual than every one of them; the best of the five, Frant, manages 75.1%.
Wadhurst takes its name from a market town called Wadhurst, home to about 4,915 people, and the station stands 2.4 km from its centre.
For Wadhurst, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 53.9% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2024-25, at 88.3%, which is 34.4 percentage points higher. Cancellations peaked at 7.1% of scheduled stops in Period 10 of 2023-24, against 1.8% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Wadhurst is the least punctual, at 75.6%. All of them are ahead, including Windsor and Eton Riverside (91.7%), Datchet (94.5%) and Bishopstone (Sussex) (87.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 25,643 | 75.6% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Wadhurst? Delay Repay
These operators call at Wadhurst and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,956 | 60.1% | 2.0% |
| Period 6 of 2026-27 | 2,000 | 53.9% | 2.1% |
| Period 5 of 2026-27 | 2,019 | 71.7% | 2.0% |
| Period 4 of 2026-27 | 2,002 | 81.1% | 0.5% |
| Period 3 of 2026-27 | 1,942 | 80.1% | 2.5% |
| Period 2 of 2026-27 | 2,019 | 80.2% | 2.7% |
| Period 1 of 2026-27 | 2,296 | 84.4% | 0.6% |
| Period 13 of 2025-26 | 2,221 | 82.5% | 0.8% |
| Period 12 of 2025-26 | 2,010 | 84.1% | 1.2% |
| Period 11 of 2025-26 | 1,943 | 79.7% | 2.6% |
| Period 10 of 2025-26 | 1,839 | 76.3% | 2.8% |
| Period 9 of 2025-26 | 2,011 | 70.8% | 2.7% |
| Period 8 of 2025-26 | 1,385 | 75.2% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Windsor and Eton Riverside | 25,728 | 91.7% | 2.3% |
| Datchet | 25,545 | 94.5% | 2.4% |
| Bishopstone (Sussex) | 25,762 | 87.8% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out