Datchet
DATSouth EastManaged by South Western Railway
How this station is performing
Datchet had 25,545 scheduled stops to Period 7 of 2026-27, about 70 a day. 94.5% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Datchet opened on 22 August 1848, 178 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Slough is the oldest (1838) and Sunnymeads the newest (1927), with Datchet in between.
The nearest stations to Datchet are Windsor and Eton Riverside (1.9 km west), Sunnymeads (2.0 km south-east), Windsor and Eton Central (2.2 km west), Slough (3.3 km north) and Wraysbury (3.8 km south-east). 17 stations lie within 10 km in all. Of the five, Windsor and Eton Central is the most punctual at 99.0% and Slough the least at 87.9%, with Datchet on 94.5%.
Datchet takes its name from a Village called Datchet, home to about 5,141 people, and the station stands 0.3 km from its centre.
Datchet improved sharply over the past year. In the latest 13 periods 94.5% of stops came within three minutes of the timetable, up 5.7 percentage points from 88.8% in the 13 before. Cancellations fell to 2.4% of scheduled stops from 4.0%, which is 1.6 percentage points fewer.
Compared with 3 stations of a similar size in South East, Datchet is the most punctual, at 94.5%. The comparison group includes New Milton (72.1%), Wadhurst (75.6%) and Blackwater (86.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 25,545 | 94.5% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Datchet? Delay Repay
These operators call at Datchet and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,695 | 96.6% | 1.1% |
| Period 6 of 2026-27 | 2,029 | 94.3% | 2.9% |
| Period 5 of 2026-27 | 2,027 | 93.3% | 2.5% |
| Period 4 of 2026-27 | 1,967 | 94.2% | 1.8% |
| Period 3 of 2026-27 | 1,981 | 93.5% | 1.9% |
| Period 2 of 2026-27 | 2,043 | 94.4% | 6.4% |
| Period 1 of 2026-27 | 2,209 | 94.6% | 2.8% |
| Period 13 of 2025-26 | 2,172 | 94.1% | 0.8% |
| Period 12 of 2025-26 | 2,026 | 92.9% | 2.5% |
| Period 11 of 2025-26 | 2,031 | 97.2% | 0.5% |
| Period 10 of 2025-26 | 1,867 | 96.9% | 2.1% |
| Period 9 of 2025-26 | 1,966 | 95.5% | 2.1% |
| Period 8 of 2025-26 | 1,532 | 91.5% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| New Milton | 25,457 | 72.1% | 5.8% |
| Wadhurst | 25,643 | 75.6% | 1.8% |
| Blackwater | 25,414 | 86.0% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out