Virginia Water
VIRSouth EastManaged by South Western Railway
How this station is performing
Virginia Water had 53,387 scheduled stops to Period 7 of 2026-27, about 147 a day. 86.5% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Virginia Water opened on 9 July 1856, 170 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Chertsey is the oldest (1848) and Longcross the newest (1942), with Virginia Water in between.
The nearest stations to Virginia Water are Longcross (2.9 km south-west), Egham (3.3 km north), Chertsey (4.0 km south-east), Sunningdale (5.0 km west) and Staines (5.4 km north-east). 21 stations lie within 10 km in all. Of the five, Staines is the most punctual at 88.7% and Chertsey the least at 84.6%, with Virginia Water on 86.5%.
Virginia Water takes its name from a Village called Virginia Water, home to about 5,940 people, and the station stands 1.9 km from its centre.
Across the whole run of data, the weakest four-week period for Virginia Water was Period 9 of 2024-25, at 67.4%, some time before the latest year. The strongest was Period 1 of 2026-27, at 91.5%, and the two are 24.1 percentage points apart. Cancellations peaked at 5.4% of scheduled stops in Period 2 of 2026-27, against 2.5% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than Virginia Water on 86.5%. The comparison group includes Leatherhead (85.4%), Ascot (Berks) (91.8%) and Ashtead (85.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 53,387 | 86.5% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Virginia Water? Delay Repay
These operators call at Virginia Water and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,236 | 87.1% | 1.3% |
| Period 6 of 2026-27 | 3,891 | 87.5% | 2.0% |
| Period 5 of 2026-27 | 4,118 | 87.0% | 2.0% |
| Period 4 of 2026-27 | 4,014 | 87.8% | 2.7% |
| Period 3 of 2026-27 | 4,188 | 86.5% | 2.6% |
| Period 2 of 2026-27 | 4,104 | 88.3% | 5.4% |
| Period 1 of 2026-27 | 4,515 | 91.5% | 2.3% |
| Period 13 of 2025-26 | 4,515 | 89.6% | 1.9% |
| Period 12 of 2025-26 | 4,019 | 89.0% | 2.3% |
| Period 11 of 2025-26 | 4,000 | 86.0% | 1.5% |
| Period 10 of 2025-26 | 3,724 | 86.6% | 2.0% |
| Period 9 of 2025-26 | 3,918 | 77.6% | 2.3% |
| Period 8 of 2025-26 | 4,145 | 78.3% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Leatherhead | 53,226 | 85.4% | 3.1% |
| Ascot (Berks) | 53,193 | 91.8% | 2.0% |
| Ashtead | 53,176 | 85.0% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out