Uttoxeter
UTTWest MidlandsManaged by East Midlands Railway
How this station is performing
Uttoxeter has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 10,804 scheduled stops, about 30 a day. In those periods 77.7% of stops arrived within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Uttoxeter opened on 7 August 1848. It was moved to the site it uses now on 22 September 1881. Among the 5 stations nearest to it with a known opening date, Burton-on-Trent is the oldest (1839) and Rugeley Town the newest (1870), with Uttoxeter in between.
Uttoxeter is remote: its nearest neighbours are Tutbury and Hatton (12.2 km east), Rugeley Trent Valley (15.0 km south), Blythe Bridge (16.2 km north-west), Rugeley Town (16.7 km south) and Burton-on-Trent (17.6 km south-east). Of the five, Rugeley Town is the most punctual at 94.3% and Burton-on-Trent the least at 68.9%, with Uttoxeter on 77.7%.
Uttoxeter takes its name from a market town called Uttoxeter, home to about 14,021 people, and the station stands 0.3 km from its centre.
1 of 3 stations of a similar size in West Midlands are more punctual than Uttoxeter on 77.7%. The comparison group includes Blythe Bridge (75.5%), Longton (68.6%) and The Lakes (Warks) (83.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 10,804 | 77.7% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Uttoxeter? Delay Repay
These operators call at Uttoxeter and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 828 | 78.9% | 2.3% |
| Period 6 of 2026-27 | 828 | 77.3% | 1.7% |
| Period 5 of 2026-27 | 827 | 73.1% | 3.6% |
| Period 4 of 2026-27 | 761 | 67.9% | 2.1% |
| Period 3 of 2026-27 | 827 | 72.3% | 3.9% |
| Period 2 of 2026-27 | 828 | 84.2% | 3.9% |
| Period 1 of 2026-27 | 956 | 85.2% | 1.7% |
| Period 13 of 2025-26 | 915 | 83.4% | 1.7% |
| Period 12 of 2025-26 | 828 | 80.4% | 0.5% |
| Period 11 of 2025-26 | 786 | 84.3% | 2.9% |
| Period 10 of 2025-26 | 760 | 76.6% | 1.1% |
| Period 9 of 2025-26 | 832 | 66.2% | 3.4% |
| Period 8 of 2025-26 | 828 | – | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Blythe Bridge | 10,796 | 75.5% | 2.4% |
| Longton | 10,795 | 68.6% | 2.5% |
| The Lakes (Warks) | 11,179 | 83.9% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out