Blythe Bridge
BYBWest MidlandsManaged by East Midlands Railway
How this station is performing
Blythe Bridge has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 10,796 scheduled stops, about 30 a day. In those periods 75.5% of stops arrived within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Blythe Bridge opened on 7 August 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Blythe Bridge is the oldest; the next oldest, Longton, dates from 1848.
The nearest stations to Blythe Bridge are Longton (5.3 km north-west), Stoke-on-Trent (8.8 km north-west), Stone (Staffs) (8.9 km south-west), Longport (13.0 km north-west) and Uttoxeter (16.2 km south-east). 3 stations lie within 10 km in all. Of the five, Uttoxeter is the most punctual at 77.7% and Stoke-on-Trent the least at 62.2%, with Blythe Bridge on 75.5%.
Blythe Bridge takes its name from a Village called Blythe Bridge, home to about 5,931 people, and the station stands 0.4 km from its centre.
2 of 3 stations of a similar size in West Midlands are more punctual than Blythe Bridge on 75.5%. The comparison group includes Longton (68.6%), Uttoxeter (77.7%) and The Lakes (Warks) (83.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 10,796 | 75.5% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Blythe Bridge? Delay Repay
These operators call at Blythe Bridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 828 | 74.7% | 2.5% |
| Period 6 of 2026-27 | 828 | 74.9% | 1.7% |
| Period 5 of 2026-27 | 827 | 68.5% | 4.0% |
| Period 4 of 2026-27 | 761 | 66.3% | 2.1% |
| Period 3 of 2026-27 | 827 | 71.4% | 3.9% |
| Period 2 of 2026-27 | 828 | 82.7% | 4.0% |
| Period 1 of 2026-27 | 956 | 82.9% | 1.7% |
| Period 13 of 2025-26 | 911 | 80.6% | 1.9% |
| Period 12 of 2025-26 | 828 | 78.5% | 0.7% |
| Period 11 of 2025-26 | 786 | 82.6% | 3.1% |
| Period 10 of 2025-26 | 760 | 73.6% | 1.1% |
| Period 9 of 2025-26 | 828 | 67.0% | 3.6% |
| Period 8 of 2025-26 | 828 | – | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Longton | 10,795 | 68.6% | 2.5% |
| Uttoxeter | 10,804 | 77.7% | 2.3% |
| The Lakes (Warks) | 11,179 | 83.9% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out