Longton
LGNWest MidlandsManaged by East Midlands Railway
How this station is performing
Longton had 10,795 scheduled stops to Period 7 of 2026-27, about 30 a day. 68.6% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Longton opened on 7 August 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Longton is the oldest; the next oldest, Stoke-on-Trent, dates from 1848.
The nearest stations to Longton are Stoke-on-Trent (3.6 km north-west), Blythe Bridge (5.3 km south-east), Longport (7.9 km north-west), Stone (Staffs) (9.2 km south) and Kidsgrove (12.9 km north-west). 4 stations lie within 10 km in all. Of the five, Blythe Bridge is the most punctual at 75.5% and Stoke-on-Trent the least at 62.2%, with Longton on 68.6%.
Longton is one of 3 stations named after a town called Longton, home to about 27,214 people; this one stands 0.4 km from its centre.
Longton has slipped sharply. 68.6% of stops came within three minutes of the timetable in the latest 13 periods, 7.2 percentage points worse than the 75.8% recorded in the 13 before. Cancellations held steady at 2.5% of scheduled stops, against 2.1% before.
Compared with 3 stations of a similar size in West Midlands, Longton is the least punctual, at 68.6%. All of them are ahead, including Blythe Bridge (75.5%), Uttoxeter (77.7%) and The Lakes (Warks) (83.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 10,795 | 68.6% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Longton? Delay Repay
These operators call at Longton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 828 | 66.8% | 2.4% |
| Period 6 of 2026-27 | 828 | 65.2% | 1.7% |
| Period 5 of 2026-27 | 827 | 62.5% | 4.0% |
| Period 4 of 2026-27 | 761 | 59.3% | 2.1% |
| Period 3 of 2026-27 | 827 | 64.1% | 3.9% |
| Period 2 of 2026-27 | 828 | 73.9% | 4.0% |
| Period 1 of 2026-27 | 956 | 76.3% | 1.8% |
| Period 13 of 2025-26 | 910 | 75.8% | 2.0% |
| Period 12 of 2025-26 | 828 | 69.9% | 0.7% |
| Period 11 of 2025-26 | 786 | 75.9% | 3.1% |
| Period 10 of 2025-26 | 760 | 68.3% | 1.1% |
| Period 9 of 2025-26 | 828 | 61.9% | 3.9% |
| Period 8 of 2025-26 | 828 | 69.5% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Blythe Bridge | 10,796 | 75.5% | 2.4% |
| Uttoxeter | 10,804 | 77.7% | 2.3% |
| The Lakes (Warks) | 11,179 | 83.9% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out