London Overground at Upminster
All trains at UpminsterLondon Overground across BritainLondon
How this operator is doing here
London Overground had 22,220 scheduled stops at Upminster in the 13 periods to Period 7 of 2026-27, 22% of the station's total. 99.7% of recorded arrivals came within three minutes and 0.4% of stops were cancelled.
London Overground trains at Upminster also serve Emerson Park (2.4 km north-west, – on time, 0.4% cancelled), Romford (5.1 km west, 99.7% on time, 0.4% cancelled), Barking Riverside (10.4 km south-west, 96.7% on time, 4.0% cancelled), Barking (12.1 km west, 94.3% on time, 3.5% cancelled), Woodgrange Park (14.4 km west, 93.8% on time, 3.0% cancelled) and Wanstead Park (15.6 km west, 94.5% on time, 3.1% cancelled), which are the stations on its network closest to Upminster.
Within 30 km of here, London Overground runs best at Romford, 5.1 km west (99.7%), and worst at Hampstead Heath, 28.9 km west (77.5%).
The busiest London Overground station within 30 km of Upminster is Highbury and Islington, 24.6 km west, with about 593 scheduled stops a day.
Of the 2 operators with enough records at Upminster, London Overground is the most punctual, at 99.7%.
For London Overground, Upminster is the 2nd best of 111 ranked stations. Its 99.7% here is 10.3 percentage points above the 89.4% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,720 | 99.9% | 0.0% |
| Period 6 of 2026-27 | 1,720 | 99.8% | 0.4% |
| Period 5 of 2026-27 | 1,720 | 99.6% | 0.3% |
| Period 4 of 2026-27 | 1,720 | 99.8% | 0.8% |
| Period 3 of 2026-27 | 1,720 | 99.9% | 0.1% |
| Period 2 of 2026-27 | 1,712 | 98.1% | 0.4% |
| Period 1 of 2026-27 | 1,976 | 99.8% | 0.1% |
| Period 13 of 2025-26 | 1,518 | 99.9% | 2.0% |
| Period 12 of 2025-26 | 1,720 | 99.9% | 0.0% |
| Period 11 of 2025-26 | 1,720 | 100.0% | 0.2% |
| Period 10 of 2025-26 | 1,582 | 100.0% | 0.4% |
| Period 9 of 2025-26 | 1,674 | 99.9% | 0.2% |
| Period 8 of 2025-26 | 1,718 | 100.0% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Upminster
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| c2c | 80,425 | 90.8% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out