c2c at Upminster
How this operator is doing here
c2c had 80,425 scheduled stops at Upminster in the 13 periods to Period 7 of 2026-27, 78% of the station's total. 90.8% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
c2c trains at Upminster also serve Ockendon (5.0 km south-east, 88.8% on time, 3.0% cancelled), West Horndon (6.2 km east, 92.1% on time, 1.7% cancelled), Rainham (Essex) (6.4 km south-west, 92.5% on time, 2.6% cancelled), Dagenham Dock (8.3 km south-west, 92.5% on time, 2.6% cancelled), Chafford Hundred Lakeside (8.6 km south, 88.1% on time, 3.1% cancelled) and Purfleet (8.7 km south, 91.6% on time, 2.7% cancelled), which are the stations on its network closest to Upminster.
Within 30 km of here, c2c runs best at Rainham (Essex), 6.4 km south-west (92.5%), and worst at London Liverpool Street, 23.5 km west (85.5%).
The busiest c2c station within 30 km of Upminster is Barking, 12.1 km west, with about 293 scheduled stops a day.
Of the 2 operators with enough records at Upminster, c2c is the least punctual, at 90.8%.
c2c at Upminster has slipped a little, from 93.6% within three minutes in the previous 13 periods to 90.8% in the latest 13, a fall of 2.8 percentage points. Cancellations rose to 2.0% of scheduled stops from 1.4%, which is 0.6 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,743 | 83.3% | 2.0% |
| Period 6 of 2026-27 | 5,458 | 81.7% | 4.2% |
| Period 5 of 2026-27 | 5,365 | 86.7% | 2.6% |
| Period 4 of 2026-27 | 6,405 | 92.5% | 3.8% |
| Period 3 of 2026-27 | 5,888 | 91.7% | 2.4% |
| Period 2 of 2026-27 | 6,220 | 93.7% | 2.8% |
| Period 1 of 2026-27 | 7,215 | 93.4% | 1.5% |
| Period 13 of 2025-26 | 6,909 | 94.8% | 1.2% |
| Period 12 of 2025-26 | 6,152 | 94.4% | 1.5% |
| Period 11 of 2025-26 | 6,090 | 94.7% | 0.9% |
| Period 10 of 2025-26 | 5,530 | 88.5% | 1.3% |
| Period 9 of 2025-26 | 6,299 | 92.3% | 0.8% |
| Period 8 of 2025-26 | 6,151 | 91.0% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Upminster
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 22,220 | 99.7% | 0.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out