How this station is performing
Tyndrum Lower has usable figures for 6 of the last 13 four-week periods to Period 7 of 2026-27, covering 4,138 scheduled stops, about 11 a day. In those periods 63.4% of stops arrived within three minutes of the timetable and 1.1% of scheduled stops were cancelled.
Tyndrum Lower opened on 1 August 1873. It was moved to the site it uses now on 1 May 1877. Of the 5 stations nearest to it with a known opening date, Tyndrum Lower is the oldest; the next oldest, Dalmally, dates from 1877.
The nearest stations to Tyndrum Lower are Upper Tyndrum (0.6 km east), Crianlarich (7.6 km south-east), Bridge of Orchy (9.7 km north), Ardlui (14.6 km south) and Dalmally (16.9 km west). 3 stations lie within 10 km in all. Of the five, Dalmally is the most punctual at 78.2% and Crianlarich the least at 60.4%, with Tyndrum Lower on 63.4%.
Tyndrum Lower is named after Tyndrum, a Village, home to about 167 people, but the station stands 0.3 km from its centre.
For Tyndrum Lower, the weakest four-week period in the data is a recent one: Period 2 of 2026-27, when only 58.6% of stops arrived within three minutes of the timetable. The strongest was Period 6 of 2026-27, at 66.3%, which is 7.7 percentage points higher. Cancellations peaked at 5.3% of scheduled stops in Period 11 of 2023-24, against 1.1% over the latest 13 periods.
ScotRail is the only operator serving Tyndrum Lower. Here it manages 63.4% within three minutes, 24.5 percentage points worse than its 87.9% across its whole network.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 4,138 | 63.4% | 1.1% |
Operators with their own page for this station are linked to it.
Late train at Tyndrum Lower? Delay Repay
These operators call at Tyndrum Lower and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 320 | – | 0.0% |
| Period 6 of 2026-27 | 320 | 66.3% | 0.9% |
| Period 5 of 2026-27 | 320 | – | 0.9% |
| Period 4 of 2026-27 | 320 | 65.7% | 1.6% |
| Period 3 of 2026-27 | 320 | 60.8% | 0.9% |
| Period 2 of 2026-27 | 320 | 58.6% | 0.0% |
| Period 1 of 2026-27 | 366 | 64.6% | 0.0% |
| Period 13 of 2025-26 | 351 | 64.7% | 1.7% |
| Period 12 of 2025-26 | 312 | – | 0.0% |
| Period 11 of 2025-26 | 306 | – | 1.0% |
| Period 10 of 2025-26 | 262 | – | 3.8% |
| Period 9 of 2025-26 | 310 | – | 2.9% |
| Period 8 of 2025-26 | 311 | – | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out