How this station is performing
Treorchy had 20,532 scheduled stops to Period 7 of 2026-27, about 56 a day. 97.4% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Treorchy opened on 27 September 1869. It was moved to the site it uses now on 3 March 1884. Among the 5 stations nearest to it with a known opening date, Ton Pentre is the oldest (1861) and Ystrad Rhondda the newest (1986), with Treorchy in between.
The nearest stations to Treorchy are Ynyswen (1.4 km north-west), Ton Pentre (1.8 km south-east), Treherbert (2.6 km north-west), Ystrad Rhondda (3.1 km south-east) and Llwynypia (4.5 km south-east). 12 stations lie within 10 km in all. Of the five, Treherbert is the most punctual at 98.1% and Ystrad Rhondda the least at 95.9%, with Treorchy on 97.4%.
Treorchy takes its name from a Village called Treorchy, home to about 8,105 people, and the station stands 0.2 km from its centre.
Treorchy is among the most punctual stations in Britain. Its 97.4% puts it 28th out of 2,374 ranked stations, with 27 ahead of it and 2,346 behind, and 13.5 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in Wales, Treorchy is the most punctual, at 97.4%. The comparison group includes Ton Pentre (96.6%), Dinas (Rhondda) (96.2%) and Llwynypia (96.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 20,532 | 97.4% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Treorchy? Delay Repay
These operators call at Treorchy and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,563 | 98.2% | 2.3% |
| Period 6 of 2026-27 | 1,651 | 97.7% | 3.3% |
| Period 5 of 2026-27 | 696 | 98.2% | 1.1% |
| Period 4 of 2026-27 | 1,661 | 97.6% | 1.1% |
| Period 3 of 2026-27 | 1,624 | 97.8% | 2.4% |
| Period 2 of 2026-27 | 1,650 | 98.4% | 1.6% |
| Period 1 of 2026-27 | 1,854 | 98.5% | 4.5% |
| Period 13 of 2025-26 | 1,808 | 98.1% | 0.4% |
| Period 12 of 2025-26 | 1,654 | 95.3% | 1.6% |
| Period 11 of 2025-26 | 1,638 | 96.9% | 1.2% |
| Period 10 of 2025-26 | 1,452 | 96.2% | 1.9% |
| Period 9 of 2025-26 | 1,649 | 96.3% | 2.1% |
| Period 8 of 2025-26 | 1,632 | 96.9% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ton Pentre | 20,532 | 96.6% | 1.9% |
| Dinas (Rhondda) | 20,585 | 96.2% | 1.6% |
| Llwynypia | 20,585 | 96.2% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out