Llwynypia
LLYWalesManaged by TfW Rail
How this station is performing
Llwynypia had 20,585 scheduled stops to Period 7 of 2026-27, about 57 a day. 96.2% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Llwynypia opened on 1 April 1871, 155 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Dinas (Rhondda) is the oldest (1861) and Ystrad Rhondda the newest (1986), with Llwynypia in between.
The nearest stations to Llwynypia are Ystrad Rhondda (1.5 km north-west), Tonypandy (1.5 km south), Dinas (Rhondda) (2.1 km south-east), Ton Pentre (2.8 km north-west) and Porth (3.9 km south-east). 19 stations lie within 10 km in all. Of the five, Ton Pentre is the most punctual at 96.6% and Porth the least at 94.4%, with Llwynypia on 96.2%.
Llwynypia takes its name from a Village called Llwynypia, home to about 2,253 people, and the station stands 0.4 km from its centre.
Llwynypia improved sharply over the past year. In the latest 13 periods 96.2% of stops came within three minutes of the timetable, up 5.4 percentage points from 90.8% in the 13 before. Cancellations fell to 1.7% of scheduled stops from 3.3%, which is 1.6 percentage points fewer.
Compared with 3 stations of a similar size in Wales, Llwynypia is the most punctual, at 96.2%. The comparison group includes Dinas (Rhondda) (96.2%), Tonypandy (96.2%) and Trehafod (96.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 20,585 | 96.2% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Llwynypia? Delay Repay
These operators call at Llwynypia and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,563 | 96.6% | 2.3% |
| Period 6 of 2026-27 | 1,651 | 97.0% | 3.3% |
| Period 5 of 2026-27 | 696 | 96.2% | 1.6% |
| Period 4 of 2026-27 | 1,661 | 95.7% | 1.0% |
| Period 3 of 2026-27 | 1,624 | 96.4% | 2.5% |
| Period 2 of 2026-27 | 1,650 | 97.1% | 1.6% |
| Period 1 of 2026-27 | 1,907 | 97.5% | 2.0% |
| Period 13 of 2025-26 | 1,808 | 98.0% | 0.6% |
| Period 12 of 2025-26 | 1,654 | 94.7% | 1.3% |
| Period 11 of 2025-26 | 1,638 | 96.2% | 1.2% |
| Period 10 of 2025-26 | 1,452 | 94.5% | 1.6% |
| Period 9 of 2025-26 | 1,649 | 94.4% | 1.9% |
| Period 8 of 2025-26 | 1,632 | 96.1% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dinas (Rhondda) | 20,585 | 96.2% | 1.6% |
| Tonypandy | 20,585 | 96.2% | 1.7% |
| Trehafod | 20,585 | 96.1% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out