Dinas (Rhondda)
DMGWalesManaged by TfW Rail
How this station is performing
Dinas (Rhondda) had 20,585 scheduled stops to Period 7 of 2026-27, about 57 a day. 96.2% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Dinas (Rhondda) opened on 1 May 1861. It was moved to the site it uses now on 2 August 1886. Of the 5 stations nearest to it with a known opening date, Dinas (Rhondda) is the oldest; the next oldest, Porth, dates from 1861.
The nearest stations to Dinas (Rhondda) are Tonypandy (0.9 km west), Porth (2.1 km east), Llwynypia (2.1 km north-west), Ystrad Rhondda (3.6 km north-west) and Trehafod (4.0 km east). 18 stations lie within 10 km in all. At 96.2%, Dinas (Rhondda) is more punctual than every one of them; the best of the five, Llwynypia, manages 96.2%.
Dinas (Rhondda) is named after Dinas Rhondda, a Village, but the station stands 0.5 km from its centre.
Dinas (Rhondda) improved sharply over the past year. In the latest 13 periods 96.2% of stops came within three minutes of the timetable, up 5.3 percentage points from 90.9% in the 13 before. Cancellations fell to 1.6% of scheduled stops from 3.2%, which is 1.6 percentage points fewer.
Compared with 3 stations of a similar size in Wales, Dinas (Rhondda) is the most punctual, at 96.2%. The comparison group includes Llwynypia (96.2%), Tonypandy (96.2%) and Trehafod (96.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 20,585 | 96.2% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Dinas (Rhondda)? Delay Repay
These operators call at Dinas (Rhondda) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,563 | 96.2% | 2.2% |
| Period 6 of 2026-27 | 1,651 | 96.9% | 3.5% |
| Period 5 of 2026-27 | 696 | 96.4% | 1.6% |
| Period 4 of 2026-27 | 1,661 | 96.6% | 1.0% |
| Period 3 of 2026-27 | 1,624 | 95.7% | 2.5% |
| Period 2 of 2026-27 | 1,650 | 97.0% | 1.6% |
| Period 1 of 2026-27 | 1,907 | 97.8% | 1.8% |
| Period 13 of 2025-26 | 1,808 | 98.1% | 0.5% |
| Period 12 of 2025-26 | 1,654 | 95.4% | 1.3% |
| Period 11 of 2025-26 | 1,638 | 95.8% | 1.2% |
| Period 10 of 2025-26 | 1,452 | 95.0% | 1.4% |
| Period 9 of 2025-26 | 1,649 | 94.3% | 1.9% |
| Period 8 of 2025-26 | 1,632 | 95.5% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out