How this station is performing
Totton had 17,147 scheduled stops to Period 7 of 2026-27, about 47 a day. 68.7% of recorded arrivals were within three minutes of the timetable and 5.5% of scheduled stops were cancelled.
The nearest stations to Totton are Redbridge (1.0 km east), Millbrook (Hants) (3.5 km east), Ashurst New Forest (4.3 km south-west), Southampton Central (5.0 km east) and St Denys (6.7 km east). 12 stations lie within 10 km in all. At 68.7%, Totton is less punctual than all of them; the best of the five, Millbrook (Hants), manages 79.1%.
Totton takes its name from a town called Totton, and the station stands 0.5 km from its centre.
Totton has slipped sharply. 68.7% of stops came within three minutes of the timetable in the latest 13 periods, 7.1 percentage points worse than the 75.8% recorded in the 13 before. Cancellations rose to 5.5% of scheduled stops from 3.7%, which is 1.8 percentage points more.
Across the whole run of data, the weakest four-week period for Totton was Period 9 of 2024-25, at 48.8%, some time before the latest year. The strongest was Period 1 of 2023-24, at 86.1%, and the two are 37.3 percentage points apart.
Compared with 3 stations of a similar size in South East, Totton is the least punctual, at 68.7%. All of them are ahead, including Canterbury East (71.1%), Radley (71.1%) and Dumpton Park (80.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 17,146 | 68.7% | 5.5% |
| CrossCountry | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Totton? Delay Repay
These operators call at Totton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,263 | 57.8% | 3.3% |
| Period 6 of 2026-27 | 1,322 | 65.1% | 1.8% |
| Period 5 of 2026-27 | 1,333 | 53.3% | 5.1% |
| Period 4 of 2026-27 | 1,338 | 58.5% | 6.4% |
| Period 3 of 2026-27 | 1,258 | 72.3% | 8.1% |
| Period 2 of 2026-27 | 1,327 | 70.5% | 8.7% |
| Period 1 of 2026-27 | 1,455 | 81.3% | 3.2% |
| Period 13 of 2025-26 | 1,491 | 81.2% | 6.2% |
| Period 12 of 2025-26 | 1,231 | 80.4% | 7.5% |
| Period 11 of 2025-26 | 1,329 | 78.9% | 7.4% |
| Period 10 of 2025-26 | 1,161 | 75.0% | 3.7% |
| Period 9 of 2025-26 | 1,345 | 57.5% | 5.3% |
| Period 8 of 2025-26 | 1,294 | 60.7% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Canterbury East | 17,209 | 71.1% | 1.3% |
| Radley | 17,054 | 71.1% | 4.5% |
| Dumpton Park | 17,036 | 80.8% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out