Radley
RADSouth EastManaged by Great Western Railway
How this station is performing
Radley had 17,054 scheduled stops to Period 7 of 2026-27, about 47 a day. 71.1% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Radley opened on 2 June 1856. It was moved to the site it uses now on 8 September 1873. Among the 5 stations nearest to it with a known opening date, Culham is the oldest (1844) and Oxford Parkway the newest (2015), with Radley in between.
The nearest stations to Radley are Culham (3.5 km south), Appleford (5.1 km south), Oxford (7.8 km north), Didcot Parkway (8.3 km south) and Oxford Parkway (13.4 km north). 4 stations lie within 10 km in all. Of the five, Oxford Parkway is the most punctual at 92.5% and Didcot Parkway the least at 70.8%, with Radley on 71.1%.
Radley takes its name from a Village called Radley, home to about 2,920 people, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Radley was Period 1 of 2023-24, at 44.8%, some time before the latest year. The strongest was Period 2 of 2023-24, at 97.3%, and the two are 52.5 percentage points apart. Cancellations peaked at 39.6% of scheduled stops in Period 1 of 2023-24, against 4.5% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Radley on 71.1%. The comparison group includes Dumpton Park (80.8%), Totton (68.7%) and Marlow (95.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 17,054 | 71.1% | 4.5% |
Operators with their own page for this station are linked to it.
Late train at Radley? Delay Repay
These operators call at Radley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,326 | 70.7% | 4.4% |
| Period 6 of 2026-27 | 1,330 | 66.3% | 3.5% |
| Period 5 of 2026-27 | 1,326 | 67.0% | 11.2% |
| Period 4 of 2026-27 | 1,326 | 63.4% | 5.7% |
| Period 3 of 2026-27 | 1,326 | 72.0% | 5.0% |
| Period 2 of 2026-27 | 1,326 | 69.9% | 3.4% |
| Period 1 of 2026-27 | 1,524 | 73.9% | 4.1% |
| Period 13 of 2025-26 | 1,460 | 79.2% | 3.2% |
| Period 12 of 2025-26 | 970 | 80.9% | 3.2% |
| Period 11 of 2025-26 | 1,328 | 77.4% | 3.8% |
| Period 10 of 2025-26 | 1,210 | 73.6% | 4.6% |
| Period 9 of 2025-26 | 1,276 | 64.1% | 1.6% |
| Period 8 of 2025-26 | 1,326 | 66.9% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dumpton Park | 17,036 | 80.8% | 1.7% |
| Totton | 17,147 | 68.7% | 5.5% |
| Marlow | 16,935 | 95.7% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out