Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

CrossCountry at Torquay

All trains at TorquayCrossCountry across BritainSouth West

On time, last 13 periods70.0%Whole station: 82.2%
Cancelled21.8%Whole station: 4.4%
Scheduled stops1,811Of 27,373 at the station

How this operator is doing here

CrossCountry had 1,811 scheduled stops at Torquay in the 13 periods to Period 7 of 2026-27, 7% of the station's total. 70.0% of recorded arrivals came within three minutes and 21.8% of stops were cancelled.

CrossCountry trains at Torquay also serve Paignton (3.3 km south-west, 74.1% on time, 21.8% cancelled), Newton Abbot (8.7 km north-west, 66.8% on time, 8.9% cancelled), Teignmouth (10.3 km north, 55.4% on time, 17.2% cancelled), Totnes (10.7 km west, 69.0% on time, 7.5% cancelled), Dawlish (14.4 km north-east, 52.2% on time, 17.3% cancelled) and Dawlish Warren (16.8 km north-east, – on time, – cancelled), which are the stations on its network closest to Torquay.

Within 30 km of here, CrossCountry runs best at Totnes, 10.7 km west (69.0%), and worst at Newton Abbot, 8.7 km north-west (66.8%).

The busiest CrossCountry station within 30 km of Torquay is Exeter St David's, 29.8 km north, with about 35 scheduled stops a day.

CrossCountry at Torquay has slipped sharply. 70.0% of stops came within three minutes of the timetable in the latest 13 periods, 5.0 percentage points worse than the 75.0% recorded in the 13 before. Cancellations rose to 21.8% of scheduled stops from 12.6%, which is 9.2 percentage points more.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 83.7%Period 2 of 2023-24: 82.7%Period 3 of 2023-24: 72.7%Period 4 of 2023-24: 82.3%Period 5 of 2023-24: 78.0%Period 6 of 2023-24: 71.3%Period 7 of 2023-24: 76.0%Period 8 of 2023-24: 73.5%Period 9 of 2023-24: 76.8%Period 10 of 2023-24: 74.0%Period 11 of 2023-24: 81.7%Period 12 of 2023-24: 83.5%Period 13 of 2023-24: 74.1%Period 1 of 2024-25: 83.0%Period 2 of 2024-25: 77.8%Period 3 of 2024-25: 68.0%Period 4 of 2024-25: 71.1%Period 5 of 2024-25: 77.1%Period 9 of 2024-25: 72.8%Period 10 of 2024-25: 77.0%Period 11 of 2024-25: 81.8%Period 12 of 2024-25: 77.1%Period 13 of 2024-25: 79.1%Period 1 of 2025-26: 80.5%Period 2 of 2025-26: 75.0%Period 3 of 2025-26: 67.5%Period 4 of 2025-26: 68.2%Period 5 of 2025-26: 78.5%Period 6 of 2025-26: 68.1%Period 7 of 2025-26: 73.0%Period 8 of 2025-26: 72.0%Period 9 of 2025-26: 71.7%Period 10 of 2025-26: 72.1%Period 11 of 2025-26: 69.1%Period 12 of 2025-26: 74.5%Period 13 of 2025-26: 71.0%Period 1 of 2026-27: 69.2%Period 2 of 2026-27: 69.8%Period 3 of 2026-27: 68.6%Period 4 of 2026-27: 64.3%Period 5 of 2026-27: 66.7%Period 6 of 2026-27: 70.5%Period 7 of 2026-27: 70.3%
This pageGreat Britain
0%10%20%30%40%50%Period 1 of 2023-24: 10.7%Period 2 of 2023-24: 3.9%Period 3 of 2023-24: 34.8%Period 4 of 2023-24: 47.0%Period 5 of 2023-24: 15.6%Period 6 of 2023-24: 15.3%Period 7 of 2023-24: 6.8%Period 8 of 2023-24: 27.0%Period 9 of 2023-24: 43.2%Period 10 of 2023-24: 37.3%Period 11 of 2023-24: 9.9%Period 12 of 2023-24: 7.2%Period 13 of 2023-24: 6.6%Period 1 of 2024-25: 11.9%Period 2 of 2024-25: 13.2%Period 3 of 2024-25: 11.0%Period 4 of 2024-25: 25.5%Period 5 of 2024-25: 10.5%Period 9 of 2024-25: 26.5%Period 10 of 2024-25: 13.0%Period 11 of 2024-25: 8.5%Period 12 of 2024-25: 2.5%Period 13 of 2024-25: 1.3%Period 1 of 2025-26: 17.7%Period 2 of 2025-26: 8.9%Period 3 of 2025-26: 17.9%Period 4 of 2025-26: 14.7%Period 5 of 2025-26: 7.7%Period 6 of 2025-26: 17.7%Period 7 of 2025-26: 12.1%Period 8 of 2025-26: 18.4%Period 9 of 2025-26: 36.5%Period 10 of 2025-26: 31.7%Period 11 of 2025-26: 25.2%Period 12 of 2025-26: 5.7%Period 13 of 2025-26: 7.0%Period 1 of 2026-27: 7.6%Period 2 of 2026-27: 17.1%Period 3 of 2026-27: 14.5%Period 4 of 2026-27: 22.1%Period 5 of 2026-27: 48.2%Period 6 of 2026-27: 17.3%Period 7 of 2026-27: 28.7%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2712970.3%28.7%
Period 6 of 2026-2715670.5%17.3%
Period 5 of 2026-2713766.7%48.2%
Period 4 of 2026-2714564.3%22.1%
Period 3 of 2026-2713868.6%14.5%
Period 2 of 2026-2715269.8%17.1%
Period 1 of 2026-2715869.2%7.6%
Period 13 of 2025-2611571.0%7.0%
Period 12 of 2025-2610574.5%5.7%
Period 11 of 2025-2614769.1%25.2%
Period 10 of 2025-2612672.1%31.7%
Period 9 of 2025-2615671.7%36.5%
Period 8 of 2025-2614772.0%18.4%

Time of year

70%80%90%P1: 78.0%1P2: 75.9%2P3: 68.9%3P4: 70.0%4P5: 76.2%5P6: 70.0%6P7: 73.1%7P8: 72.7%8P9: 73.5%9P10: 74.6%10P11: 77.4%11P12: 78.7%12P13: 75.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Torquay

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway25,56282.9%3.2%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out