CrossCountry had 1,811 scheduled stops at Torquay in the 13 periods to Period 7 of 2026-27, 7% of the station's total. 70.0% of recorded arrivals came within three minutes and 21.8% of stops were cancelled.
CrossCountry trains at Torquay also serve Paignton (3.3 km south-west, 74.1% on time, 21.8% cancelled), Newton Abbot (8.7 km north-west, 66.8% on time, 8.9% cancelled), Teignmouth (10.3 km north, 55.4% on time, 17.2% cancelled), Totnes (10.7 km west, 69.0% on time, 7.5% cancelled), Dawlish (14.4 km north-east, 52.2% on time, 17.3% cancelled) and Dawlish Warren (16.8 km north-east, – on time, – cancelled), which are the stations on its network closest to Torquay.
Within 30 km of here, CrossCountry runs best at Totnes, 10.7 km west (69.0%), and worst at Newton Abbot, 8.7 km north-west (66.8%).
The busiest CrossCountry station within 30 km of Torquay is Exeter St David's, 29.8 km north, with about 35 scheduled stops a day.
CrossCountry at Torquay has slipped sharply. 70.0% of stops came within three minutes of the timetable in the latest 13 periods, 5.0 percentage points worse than the 75.0% recorded in the 13 before. Cancellations rose to 21.8% of scheduled stops from 12.6%, which is 9.2 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 129 | 70.3% | 28.7% |
| Period 6 of 2026-27 | 156 | 70.5% | 17.3% |
| Period 5 of 2026-27 | 137 | 66.7% | 48.2% |
| Period 4 of 2026-27 | 145 | 64.3% | 22.1% |
| Period 3 of 2026-27 | 138 | 68.6% | 14.5% |
| Period 2 of 2026-27 | 152 | 69.8% | 17.1% |
| Period 1 of 2026-27 | 158 | 69.2% | 7.6% |
| Period 13 of 2025-26 | 115 | 71.0% | 7.0% |
| Period 12 of 2025-26 | 105 | 74.5% | 5.7% |
| Period 11 of 2025-26 | 147 | 69.1% | 25.2% |
| Period 10 of 2025-26 | 126 | 72.1% | 31.7% |
| Period 9 of 2025-26 | 156 | 71.7% | 36.5% |
| Period 8 of 2025-26 | 147 | 72.0% | 18.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Torquay
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 25,562 | 82.9% | 3.2% |