Great Western Railway at Torquay
All trains at TorquayGreat Western Railway across BritainSouth West
How this operator is doing here
Great Western Railway had 25,562 scheduled stops at Torquay in the 13 periods to Period 7 of 2026-27, 93% of the station's total. 82.9% of recorded arrivals came within three minutes and 3.2% of stops were cancelled.
Great Western Railway trains at Torquay also serve Torre (1.3 km north, 82.2% on time, 3.1% cancelled), Paignton (3.3 km south-west, 87.3% on time, 3.1% cancelled), Newton Abbot (8.7 km north-west, 73.0% on time, 3.1% cancelled), Teignmouth (10.3 km north, 77.6% on time, 3.3% cancelled), Totnes (10.7 km west, 61.5% on time, 3.9% cancelled) and Dawlish (14.4 km north-east, 77.3% on time, 3.3% cancelled), which are the stations on its network closest to Torquay.
Within 30 km of here, Great Western Railway runs best at Paignton, 3.3 km south-west (87.3%), and worst at Totnes, 10.7 km west (61.5%).
The busiest Great Western Railway station within 30 km of Torquay is Exeter St David's, 29.8 km north, with about 223 scheduled stops a day.
Of the 2 operators with enough records at Torquay, Great Western Railway is the most punctual, at 82.9%.
Great Western Railway at Torquay has slipped a little, from 85.9% within three minutes in the previous 13 periods to 82.9% in the latest 13, a fall of 3.0 percentage points. Cancellations rose to 3.2% of scheduled stops from 2.7%, which is 0.5 percentage points more.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,959 | 85.6% | 1.8% |
| Period 6 of 2026-27 | 1,990 | 80.5% | 1.9% |
| Period 5 of 2026-27 | 1,971 | 73.7% | 2.9% |
| Period 4 of 2026-27 | 1,899 | 78.6% | 9.8% |
| Period 3 of 2026-27 | 1,971 | 80.2% | 3.0% |
| Period 2 of 2026-27 | 1,987 | 79.4% | 2.2% |
| Period 1 of 2026-27 | 2,259 | 86.7% | 1.1% |
| Period 13 of 2025-26 | 1,997 | 88.7% | 2.0% |
| Period 12 of 2025-26 | 1,892 | 90.3% | 0.4% |
| Period 11 of 2025-26 | 1,953 | 85.2% | 10.9% |
| Period 10 of 2025-26 | 1,741 | 85.4% | 1.9% |
| Period 9 of 2025-26 | 1,972 | 80.8% | 1.5% |
| Period 8 of 2025-26 | 1,971 | 81.7% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Torquay
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 1,811 | 70.0% | 21.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out